Excavation shall be conducted in sections (approximately 250m in length) along one bank of the river at a time and by land-based plant.

 
  • 挖掘工程须利用陆上的机械分段(每段大约250米长)在河的两边分时进行。
今日热词
目录 附录 查词历史