Ensure a complete transfer of knowledge of the operation of the contracting function if replaced prior to the demobilization of the team. Plan enough time for the transition.

 
  • 如果更换灾难反应援救队人员,请确认完整传递简化部门的操作知识。并制定出足够的时间来进行交接。
今日热词
目录 附录 查词历史