您要查找的是不是:
- Engineering Change Request: A request or suggestion to Engineering for an improvement in a process or procedure.Eficient Consumer Response: A term used to describe a way of doin. 工程技术方面改变要求,从工程技术方面提出的针对流程或规程的调整。有效客户需求:是用于描述在零售行业如何招徕销售合作伙伴。
- Vendor Engineering Change Request 卖主工程变动申请
- ECRN Engineer Change Request Notice 原件规格更改通知
- Engineering Change Request 工程修改要求
- The person who submits a new change request. 提交新的变更请求的人员。
- Familiar with Engineering Change Control process. 熟练掌握工程更改控制流程。
- Track quality for the engineering change parts. 对工程变更件产品的质量追踪。
- Take the lead of engineering change about product. 负责领导产品方面的工程变更。
- Control of product engineering change. 产品工程变更之管制。
- Coordinate Engineering change timing with related parties. 与相关部门就工艺变更日程进行协调。
- Object - the value of the changed request attribute. 改变的请求属性值。
- The Change Request Management application template helps users track risks associated with a design change. 变更要求管理应用程式范本可以帮助使用者追踪与设计变更相关的风险。
- Type of change request being created: Problem, Enhancement, Requirement Change, New Project. 所建立的变更请求的类型,如错误报告、改进、需求变更,新项目。
- The Originator has submitted a valid issue or change request with all necessary information to the CCB Chair. 发起人提交正确的变更请求或将变更请求和所有必要的信息提交给变更控制委员会主席。
- Coordination and implementation of Engineering changes. 工程改变的协调及补充.
- The LMT Emergency Interface (EI) is also available to observe state change request results when the EMS is unavailable. 在 EMS 不可用时,还可以用 LMT 紧急情况界面 (EI) 观察状态变更请求的结果。
- The LMT Emergency Interface is also available to observe state change request results when the EMS is unavailable. 在ems不可用时,还可以用lmt紧急情况界面观察状态变更请求的结果。
- The Originator has submitted a valid i ue or change request with all nece ary information to the CCB Chair. 发起人提交正确的变更请求或将变更请求和所有必要的信息提交给变更控制委员会主席。
- For the avoidance of doubt, we do not accept any special instructions written on this Change Request Form. 为免存疑,任何在本变更申请表格上的额外手写指示,本公司将不予处理。
- Job PurposeTo manage control and administer all Engineering Change activities within the Engineering dept. 负责工程部门所有工程变更活动的控制和管理。
