- Integrated cost/schedule control using the earned value technique. 综合成本/进度控制与挣增值技术。
- Earned value analysis is always specific to a status date that you choose. 盈余分析始终与所选的状态日期相对应。
- In the Available fields list, select the Earned Value fields that you want to display, click Show, and then click OK. 在“可用域”列表中,选择想显示的盈余分析域,单击“显示”,然后单击“确定”。
- To see project and task-level earned value totals in tables, on the View menu, click More Views. 要在表中查看项目和任务级别的总盈余,请在“视图”菜单上单击“其他视图”。
- Earned value (earned value: A measure of the cost of work performed up to the status date or current date. 盈余分析(盈余分析:对到状态日期或当前日期为止已完成工作量的成本的度量。
- EVM (Earned Value Management) is a practical and integrated tool to control schedule and cost. 挣值管理是一个很好的进度与成本的集成项目管理工具。
- Analyze earned value calculations, including budgeted cost of work performed (BCWP), schedule variance (SV), and cost variance percent (CV%). 分析盈余分析计算,包括已完成工作的预算成本(BCWP)、日程差异(SV)和成本差异百分比(CV%25)。
- Performance reporting focuses on examining earned value analysis to determine whether cost overruns will require budget revisions. 绩效报告侧重于净值分析,以决定费用是否超支,是否需要调整预算。
- The following fields represent all the earned value currency fields (currency field: A type of field whose content is expressed as a cost. 以下域代表Microsoft Office Project中的所有盈余分析货币域(货币域:一种其内容表示为成本的域。
- Earned Value Management (EVM).A method for integrating scope, schedule, and resources, and for measuring project performance. 实获值管理----一种整合范畴、时程、资源以衡量专案成效的方法。
- The earned value technique measures performance of the project as it moves from project initiation through project closure. 实现价值技术从项目的启动开始一直到项目收尾结束始终测量项目的实施结果。
- The earned value management methodology also provides a means to forecast future performance based upon past performance. 实现价值管理技术的方法还是根据过去的实施结果预测未来绩效的一种手段。
- An Empirical Research of Accounting Earnings'Value Relevance II. 会计盈余价值相关性实证研究2。
- A rich set of predefined or custom metrics helps you track data (percent complete, budget versus actual, earned value, and the like) relevant to your needs. 可以使用一组丰富的预定义或自定义衡量标准来帮助您跟踪所需的相关数据(完成百分比、预算与实际成本、盈余分析等)。
- Earned value uses your original cost estimates saved with a baseline and your actual work to date to show whether the actual costs incurred are on budget. 盈余分析使用与比较基准一起保存的原始成本估计值以及到当前日期为止的实际工时,以显示实际成本是否在预算范围内。
- Then,according to the process of integrating schedule control,the status analysis method of project based on Earned Value Management(EVM) is discussed. 运用EVM思想结合监控过程构建集成进度监控的具体方法。
- Finally,they proposed advanced comprehensive integration method from qualitative to quantitative and improved earned value management during realization process of the model. 最后在介绍模式的实现过程中,提出了从定性到定量的综合集成方法和改进了的挣值管理。
- In the end, EVM(Earned Value Management) was introduced to build early warning system.Then dynamic control of non-value-added actions could be processed. 最后引入了赢得值管理方法,建立非增值活动预警系统,以对非增值活动实行动态监控。
- This paper elaborated the comprehensive analysis and control progress on the cost by earned value management which means analyzing and controlling the budget and actual costs. 文章详细阐述了用挣值法进行费用、进度综合分析与控制,即对已完工作预算费用、计划工作预算费用和已完工作实际费用的分析与控制。