Due to operational requirement, two ventilation shafts (N1 and S1) located at the northern and southern side of the existing podium of the MTRC Kowloon Station shall be modified.

 
  • 为符合营运需求,位于地铁九龙站现有平台南北两面的通风井(N1及S1)须进行改善工程。
今日热词
目录 附录 查词历史