Dredging/excavation shall be carried out in accordance with dredging/excavation plan deposited under Condition 2.5 above.

 
  • 须按照上述第2.;5项条件所存放的挖泥/挖掘计划,进行挖泥/挖掘工作。
今日热词
目录 附录 查词历史