您要查找的是不是:
- The Change Request Management application template helps users track risks associated with a design change. 变更要求管理应用程式范本可以帮助使用者追踪与设计变更相关的风险。
- The Change Request Management application template for Microsoft Windows SharePoint Services 3.0 Helps users track risks associated with a design change. Microsoft Windows SharePoint Services 3.;0的变更要求管理应用程式范本可以帮助使用者追踪与设计变更相关的风险。
- Create design change and process change requests if needed. 制定设计变更和工艺变更需求。
- Principle Duties Create design change and process change requests if needed. 如有必要,按要求更改设计或流程。
- Regarding the design changes requested by LM, SJ shall have the chance to report the impact on cost and delivery for each item to LM. 关于LM要求的设计变更,SJ应有机会向LM报告每一项的费用影响和交货期影响。
- The person who submits a new change request. 提交新的变更请求的人员。
- Design Change Request 设计修改申请
- The design change multiterminal of tea table. 茶几的款式变化多端。
- Publishes the design change written notice,Renewal blueprint. 出设计更改通知书,更新图纸。
- Des the company have an effective design change control procedure in place? 该公司有有效的设计更改控制程序吗?
- Object - the value of the changed request attribute. 改变的请求属性值。
- Prepare quality plan and inspection sheet for new project or design change. 制定新产品或设计更改的产品的质量控制计划。
- Type of change request being created: Problem, Enhancement, Requirement Change, New Project. 所建立的变更请求的类型,如错误报告、改进、需求变更,新项目。
- The Originator has submitted a valid issue or change request with all necessary information to the CCB Chair. 发起人提交正确的变更请求或将变更请求和所有必要的信息提交给变更控制委员会主席。
- The LMT Emergency Interface (EI) is also available to observe state change request results when the EMS is unavailable. 在 EMS 不可用时,还可以用 LMT 紧急情况界面 (EI) 观察状态变更请求的结果。
- The LMT Emergency Interface is also available to observe state change request results when the EMS is unavailable. 在ems不可用时,还可以用lmt紧急情况界面观察状态变更请求的结果。
- Managing Database Design Changes with Rational Data Architect. 提供了关于进行数据库影响分析的有用信息。
- The Originator has submitted a valid i ue or change request with all nece ary information to the CCB Chair. 发起人提交正确的变更请求或将变更请求和所有必要的信息提交给变更控制委员会主席。
- For the avoidance of doubt, we do not accept any special instructions written on this Change Request Form. 为免存疑,任何在本变更申请表格上的额外手写指示,本公司将不予处理。
- During construction, problems often arise which require design changes. 在施工过程中,常会出现需要改变设计的问题。