Deficient floor slope angle of an ore body often needs to dig a drift (or access) in its footwall rock when adopting non-pillar sublevel caving following-vein excavation.

 
  • 采用沿脉布置的无底柱分段崩落法,当矿体底板倾角不足时,需要在下盘岩石中开掘进路。
今日热词
目录 附录 查词历史