Consider first the boiler plant involved in the cycle. Feed-water is supplied to the boiler drum, where is boiled and converted into dry saturated steam.

 
  • 首先考虑在循环中所涉及的锅炉部分。给水被供应给锅炉汽包,在那里给水被煮沸,并转化为干饱和蒸汽。
今日热词
目录 附录 查词历史