C.steel sleeve: in case based on process request, if the length is more than 30m, the steel base support could be used through chief tube forepart &removed as repeated usage purpose.

 
  • C.;钢套管 套管为钢制套管时,根据施工工艺要求,若套管长度大于30米,主管穿越前端可使用钢制托管支撑,当穿越主管出套管后,托管支撑拆掉后可供重复使用。
今日热词
目录 附录 查词历史