- Treatment on Loosen Rock Mass in Baise RCC Dam Foundation 百色水利枢纽RCC坝基岩体松弛及处理
- Baise RCC dam 百色RCC坝
- Construction management of Baise RCC main dam 百色水利枢纽碾压混凝土主坝工程施工管理
- Longtan Dam is the highest RCC dam under construction in the world at present. 摘要龙滩水电站大坝是目前世界上在建最高的碾压混凝土大坝。
- Longtan dam, which will be soom constructed, is the highest RCC dam in the world. 龙滩大坝是即将开工建设的世界最高碾压混凝土坝。
- Temperature control for entire placement section of the RCC dam body is essential for safe operation of the dam. 如何控制全断面碾压混凝土坝体温度是关系大坝运行安全的关键。
- Based on finite element method (FEM), the author compiles the three-dimensional seepage field computation program of RCC dam. 开展碾压混凝土坝渗流场的有限单元法研究工作,编制完成碾压混凝土坝三维渗流场计算程序。
- By means of profiling principle,a layer mortar spreading equipment for spreading mortar between layers in RCC dam is proposed,and a model test has been carried out on jobsite. 提出了应用仿形原理实现的碾压混凝土坝层间砂浆摊铺机械,在施工现场进行了摊铺机的模型实验,论述了砂浆摊铺机设计中的关键技术。
- The concrete in concrete gravity dam,especially in RCC dam,is a stratified structure,so that its stratification feature is key to the safety of concrete dam. 在混凝土重力坝尤其是碾压混凝土坝中,混凝土为成层结构,因而层面特性对混凝土坝的安全至关重要,个别坝段水平薄弱面的存在对混凝土坝的整体安全性有重要影响。
- Jinghong hydropower station RCC dam is in the subtropics zone,the high temperature continues very long and the temperature control in dam construction is very difficult. 景洪电站地处亚热带,高气温时间长,大坝碾压混凝土施工温控难度高。
- The model analysis method of the thermal parameters feedback during the construction period of RCC dam was set up, which was based on the method of artificial neural network. 摘要基于人工神经网络的方法,建立了碾压混凝土坝施工期热学参数反馈分析模型。
- The continuous, high strength and fast construction is the construction characteristics of RCC dam and also is the fundamental guarantee of interface bond quality. 摘要连续、高强度、快速施工既是碾压混凝土坝的施工特点,也是层间结合质量的根本保证。
- Three standards for the assessment of RCC dam s layer property are defined by coping with the relation between layer s mechanical parameters and that of dam body. 利用层面的力学参数与本体的力学参数之间的关系,建立了碾压混凝土坝层面性态评价的三个标准。
- Surface spillway tail-flaring pier joint energy dissipator of Baise RCC main dam 百色水利枢纽RCC主坝表孔宽尾墩联合消能工设计与研究
- In combination with the progress on construction technology in RCC dam and conventional concrete dam in China in recent years, a new concept RCC dam is further discussed. 结合我国近年来在碾压混凝土坝和常态混凝土坝的进展,再论新概念碾压混凝土坝。
- Three standards for the assessment of RCC dam's layer property are defined by coping with the relation between layer's mechanical parameters and that of dam body. 摘要利用层面的力学参数与本体的力学参数之间的关系,建立了碾压混凝土坝层面性态评价的三个标准。
- Comparing with conventional dam, Longtan RCC dam was constructed with large placement section and large water demand, therefore, water cooling system for dam body is somewhat different. 而龙滩大坝碾压混凝土施工仓面大,用水量大,与常态混凝土大坝通水冷却略有不同。
- RCC dam has a lot of weak interlayer whose intensity usually much lower than that of RCC itself, which makes the stability of RCC dam depend largely on the intensity of those weak inter-layers. 摘要碾压混凝土坝含有的大量软弱夹层的强度通常要比碾压混凝土本体强度低得多,从而使坝体稳定性在很大程度上取决于软弱夹层的强度。
- Li Bai is one of the greatest poets the world over. 李白是举世最伟大的诗人之一。
- Along with the constant advance of RCC damming technology in domestic, the applying scale expands incessantly, the technology of material achieves great progress too. 摘要随着我国碾压混凝土筑坝技术的不断进步,应用规模的不断扩大,筑坝材料技术也有了很大的进步。