According to the laboratory measurements of velocity and water level which were obtained before and after seting up of pile group.

 
  • 通过对河道修建高桩码头前、后的流速分布及水位试验分析得出:随着桩群长度的增加,同一根垂线上的流速分布趋于均匀。
今日热词
目录 附录 查词历史