您要查找的是不是:
- working set approach 工作区逼近
- Gets the peak working set for the lifetime of the process to date. 获取目前为止进程生存期的峰值工作集。
- Gets the peak working set size for the associated process. 获取关联进程的峰值工作集大小。
- This method will shrink the working set in a running application. 此方法将缩小正在运行的应用程序中的工作集。
- As the working set size increases, memory demand increases. 随着工作集大小的增加,内存需求也增加。
- You need a working set of data, so make sure you have it. 您需要一组有效的数据,务必确保您拥有它们。
- The working set includes both shared and private data. 工作集包括共享数据和私有数据。
- Based on the cut set approach of fuzzy programming and the economic meaning of DEA, the fuzzy DEA model is solved. 根据模糊规划取截集方法和DEA评价的经济含义,给出了模糊DEA模型的求解方法。
- Compare these with the size of working sets. 将这些数据同工作集的大小进行比较。
- To sort programs by memory usage, click Memory (Private Working Set). 若要按内存使用对程序进行排序,请单击“内存(私人工作设置)”。
- Mannar,D Ceglarek.Continuous failure diagnosis for assembly systems using rough set approach[J].Annals of the CIRP,2004,53(1). 王艳梅;胡小平;李舟军;张丽娟.;基于粗糙集理论的液体火箭发动机故障诊断[J]
- How to apply back in work setting? 如何将所学应用到工作场合?
- This kind of unhindered feeling and appreciation for the work set us thinking. 这种对作品毫无障碍的感知和欣赏引起了我们的思考。
- However, they will definitely demand faster access to their regular working set of tools, which may be quite large. 可以肯定的是对经常使用的工具集,他们要求能快速访问,这个工具集可能非常大。
- Gets or sets the maximum allowable working set size for the associated process. 获取或设置关联进程的允许的最大工作集大小。
- Gets or sets the minimum allowable working set size for the associated process. 获取或设置关联进程的允许的最小工作集大小。
- The primary thing to note is that the working set was large enough to require 138 MB of swap space. 首先要注意的是,工作区足够大,能请求138 MB的交换空间。
- The property value is equivalent to the Working Set Peak performance counter for the process. 该属性值与进程的“Working Set Peak”(工作集峰值)性能计数器等效。
- Working set information cannot be retrieved from the associated process resource. 无法从关联的进程资源检索到工作集信息。
- Dominance-based rough set approach (DRSA) DRSA