您要查找的是不是:
- The plan design of waste heat power plant switch in system in Guo Jia zhuang Cool Mine 国家庄煤矿矸石热电厂接入系统方案设计
- waste heat power plant 余热电厂
- A coal-fired electric power plant supplies an oil refinery with waste heat from its steam turbines (previously released into a nearby fjord). 一个燃煤发电厂向一个炼油厂提供蒸汽轮机产生的废热(以前此废热排放至一个附近的峡湾)。
- The waste heat power station in cement plant is closely related to the operation of cement kiln, whose fluctuation has an seriously effect on the boiler feed water deaeration result. 水泥厂的余热电站与水泥窑运行密切相关,水泥窑的波动严重影响了电站锅炉给水的除氧效果。
- In this paper, we introduce DCS and FCS, the application of DCS and FCS in heat power plant is mainly analyzed. 摘要简要介绍了集散控制系统和现场总线控制系统及其在火电厂中的应用,并做进一步的分析。
- The paper discusses the feasibility of transformer bank used in small-scale heat power plant in coal mine and its relaying protection distribution. 文章论述了线路变压器组在煤矿小型热电厂应用的可行性及继电保护配置。
- Their community gained access to central heating powered by waste heat. 他们小区也用上了利用废热的集中供热暖气。
- There were continuously increasing unstable vibration in the turbine and blower bearings during running of No.3 blower with load of the Heat Power Plant of Xiangtan Iron &Steel Co. 湘钢热电厂3%23风机带负荷运行过程中,汽轮机和风机轴先后发生不稳定振动且振幅持续增大的现象。
- Waste Heat Power Generation in New Dry Cement Line 新型干法水泥生产线纯低温余热发电项目前景广阔
- Application of film type deaerator in cement plant waste heat power station 旋膜式除氧器在水泥厂余热电站中的的应用
- low temperature waste heat power generation 低温余热发电
- pure low temperature waste heat power generation 纯低温余热发电
- The soldiers blew up the enemy power plant. 士兵们炸毁了敌人的发电厂。
- Analysis of Waste Heat Power Generation with Double-pressure 纯低温余热发电双压技术分析
- The farm has its own power plant. 这家农场自己有发电设备。
- They are planning a new nuclear power plant. 他们正在策划一座新的核电厂。
- tow-temperature waste heat power generation technology 纯低温余热发电
- The excitement about the new power plant was merely town talk. 关于新发电厂的纷纷议论只不过是桩传闻。
- The Application of Low-frequency Sound Wave Ash-cleaner in Cement Plant Waste Heat Power Station 低频声波吹灰器在水泥厂余热电站中的应用
- A probe into feasibility of auto-operation of sulphuric acid plant on waste heat power generation 硫酸装置废热发电自保运行的可行性探讨