您要查找的是不是:
- Underwater skirt pile gripper was a kind of hydraulic gripper. 水下夹桩器是一种广泛应用于海洋石油平台建设的液压夹具。
- Underwater skirt pile gripper is a kind of hydraulic gripper. 水下夹桩器是一种广泛应用于海洋石油平台建设的液压夹具。
- Underwater skirt pile gripper (USPG) was a hydraulic gripper widely applied in construction of offshore oil platform. 摘要水下夹桩器是一种广泛应用于海洋石油平台建设的液压夹具。
- Underwater skirt pile gripper is a kind of hydraulic gripper,and it is widely applied in the construction of offshore oil platform. 水下夹桩器是一种广泛应用于海洋石油平台建设的液压夹具。
- Optimization design based on finite element analysis were introduced into the hydraulic cylinder design of an underwater skirt pile gripper, and the design was finished. 摘要水下夹桩器是一种广泛应用于海洋石油平台建设的液压夹具。
- The optimal process and ANSYS Parametric Design Language were introduced,and the optimal design of hydraulic cylinder of different series underwater skirt pile gripper was finished in APDL. 优化后的结构特性与受力状况得到改善,设计出来的结构满足工程要求。
- Structural Optimization Design of Hydraulic Cylinder of Underwater Skirt Pile Gripper of Offshore Oil Platform 海洋石油平台水下夹桩器液压缸结构优化设计
- Structure Optimization of the Pressing Block Tooth in Underwater Skirt Pile Gripper of Offshore Oil Platform 海洋石油平台水下夹桩器压块齿结构优化设计
- Finite Element Analysis for the Contact Problem of Check Ring Joint Structure in Underwater Skirt Pile Gripper 水下夹桩器卡环连接结构接触有限元分析
- Contact Nonlinear Finite Element Analysis on the Pressing Block Tooth in Underwater Skirt Pile Gripper 基于接触的水下夹桩器压块齿非线性有限元分析
- Contact finite element analysis of the pressing block tooth in underwater skirt pile gripper of offshore oil platform 海洋石油平台水下夹桩器压块齿接触有限元分析
- Check ring joint structure design in underwater skirt pile gripper based on body contact nonlinear finite element analysis 基于接触的水下夹桩器卡环连接结构设计
- Keywords offshore oil platform;underwater skirt pile gripper;finite element analysis;structural optimization;pressing block tooth design; 海洋石油平台;水下夹桩器;有限元分析;结构优化;压块齿设计;
- underwater skirt pile gripper 水下夹桩器
- skirt pile gripper 抱桩器
- The packer assembly and skirt pile grippers were selected for the Pinghu jacket due to offshore leveling and grouting requirements. 为了满足海上调平和灌浆的要求,东海平湖油气田平台导管架采用了液压卡桩器和封隔器组合件。
- Pile gripper is the assistant tool for the leveling and grouting of the jacket,and its mechanical analysis is presented in this paper. 夹桩器是海上导管架调平和灌浆的辅助工具。
- I have a huge pile of letters to deal with. 我有一大堆信件要处理。
- The girl's long skirt encumber her while running. 这女孩子的长裙在她跑的时候阻碍她的行动。
- He hold on to my arm with a tenacious grip. 他紧紧抓住我的手臂不放。