您要查找的是不是:
- We are going to build the largest cable stayed bridge in the nation here. 我们这里将新建一座全国最大规模的斜拉桥。
- The scenic overlooks bridge in safari park in Hefei is a reinforced concrete single-pagoda cable stayed bridge. 合肥市野生动物园观景桥为钢筋混凝土倾斜独塔斜拉桥。
- CHEN De-wei ,FAN Li-chu,XIANG Hai-fan.Const-ruction control of stayed bridg e with single pier[J].Journal of Tongji University (Natural Scien ce),1997,25(1): 23-28. [3]陈德伟;范立础;项海帆.;确定预应力混凝土斜拉桥恒载初始索力的方法[J]
- Three examples are used to examine the performance of TMDs, the first two are a simple-supported beam with different flutter derivatives and the third is a cable- stayed bridge. 本文中采用了简支梁例题一、例题二与斜张桥例题,当考虑振态耦合与无耦合两种情况时,在不同模型时设置TMD桥梁制振折减率的比较。在垂直向TMD制振效果并无明显差别;
- Chibi Company, Changjiang Civil Engineering General Company.Engineering Geology Complement Investigation Report of 3-rd Cable Stayed Bridge King Tower Frusta along River Road in Fengjie County. 长江岩土工程总公司赤壁公司。奉节县沿江大道3号斜拉桥主塔墩工程地质补充勘察报告。
- The north branch bridge of Jingzhou Changjiang River Highway Bridge is a large span prestressed concrete cable stayed bridge with a main span of 500 m. There are 252 cables in total, with a gross weight of 2 692t. 荆州长江公路大桥北汊桥是一座大跨度预应力混凝土桥梁 ,其主桥为主跨 5 0 0m的斜拉桥 ,全桥斜拉索共 2 5 2根 ,总重量达 2 6 92t。
- The 3D free vibration properties of the cable stayed bridge on Wuhu Yangtze River bridge, which is of 180 m+312 m+180 m span, are analyzed by space bar FEM model and also by space bar slab solid hybrid FEM model. 针对芜湖长江大桥主桥 180 m +312 m +180 m的斜拉桥 ,分别采用空间杆系有限元模型与空间杆系 -板-实体混合单元有限元模型分析了桥梁的空间自振特性 ,两种模型的计算结果取得了较好的一致。
- This paper presents the construction highlights and principal technical measures adopted in the construction of pylon pier bases of Gonghe Cable Stayed Bridge in Shenyang in winter season. 介绍沈阳公和斜拉桥主塔承台冬季施工的要点和实施中的主要技术措施。
- Win and torsion resistances are two key points in the structural analysis of large -span monocable stayed bridges. 抗风与抗扭是大跨度单索面斜拉桥结构分析中的两大关键问题。
- Conceptive Design and Analysis on the Three-tower Cable Stayed Bridge with Reinforced Beam Assembled by PC Box-beam and Steel Truss 采用PC箱梁与钢桁组合加劲梁的三塔斜拉桥方案构思与分析研究
- RIGIDITY AND STABILITY OF LARGE SPAN HIGH SPEED RAILWAY CABLE STAYED BRIDGE WITH HYBRID PC-BOX GIRDER STIFFENED BY STEEL TRUSS PC箱梁与钢桁架组合加劲梁斜拉桥的刚度与稳定分析
- Summary of Developing Partial Cable Stayed Bridge 部分斜拉桥发展综述
- Single plane cable stayed bridge 单索面斜拉桥
- Double pylon cable stayed bridge 双塔斜拉桥
- The miners stayed out for the best part of a month. 矿工们持续罢工了近一个月之久。
- We stayed up yarning until midnight. 我们讲故事一直讲到半夜才睡。
- He was bearing a truss of trifles at his back. 他在背上背了一捆没有价值的杂物。
- single pylon cable stayed bridge 独塔斜拉桥
- This is the identical hotel we stayed at last year. 这就是我们去年住过的旅馆。
- And the suspension bridge from hanging vines. 悬索桥受到了悬挂着的藤的启发。
- 今日热词
-
- 深远海浮式风电平台 - deep-sea floating wind power platform
-
- 京雄高速公路 - Beijing-Xiongan expressway
-
- 农业及相关产业增加值 - the added value of agriculture and related industries