您要查找的是不是:
- furnace top pressure power generation 高炉炉衬顶气压发电
- top pressure power generation 余压发电
- Keywords cyclic economy;BF;TRT power generation;top pressure;bypass valve; 循环经济;高炉;TRT发电;顶压;旁通阀;
- Keywords Utilization of afterheat;Heating steam;Differential pressure power generation;Combination supply of afterheat;Back pressure turbine; 余热利用;供热蒸汽;差压发电;余热联供;背压汽轮机;
- Welcome to Datang Jilin Power Generation Co., Ltd. 欢迎访问大唐吉林发电有限公司。
- Datang International Power Generation Co., Ltd. 大唐国际发电股份有限公司,简称大唐发电
- Shanghai Electric Power Generation Co. 上海电气持有合资公司。
- Datang International Power Generation Co. 大唐国际发电股份有限公司。
- Technical and Economic Analysis on Frequency Control Technique Applied to Gigawatt Ultra Supercritical Pressure Power Generating Units 吉瓦级超超临界压力发电机组应用变频技术的技术与经济分析
- Robust design tool box development for power generation. 发电机健壮设计工具箱开发。
- The technique and control system of the Top Pressure Recovery Turbine Unit (TRT) system are introduced. 介绍了高炉炉顶余压透平发电装置(TRT)的工艺流程和控制系统配置。
- Electric Energy Balancing System in Weihe Power Generation Co. Ltd. 渭河发电有限公司电量平衡系统。
- In geothermal power generation, the steam comes from steam field. 在地热发电中,蒸汽来自汽田。
- Furthermore the effects of tower top pressure, temperatures of tower top and bottom, reflux ratio on product purity were analyzed. 同时探讨了塔顶压强、塔顶和塔釜温度、回流比变化对产品纯度的影响,获得了试验条件下的最佳操作条件。
- Research on low-concentration gas and VAM power generation. 完成低浓度瓦斯和矿井通风瓦斯发电项目攻关和试验。
- To realize high precision control of top pressure, the dynamic mathematical model of top gas pressure recovery turbine (TRT) system was researched. 摘要为实现高炉顶压的高精度控制,提出了高炉煤气余压透平装置(TRT)系统炉顶压力的动态数学模型。
- Compared with Tiandong crude oil,the problems of processing Madura crude oil were: high top pressure,high temperature and energy cost. 与加工田东原油(性质类似大庆原油)作比较,加工马杜拉轻质原油存在的问题是塔顶压力高,温度高,能耗高,轻烃损失大。
- Auxiliary troops;an auxiliary power generator. 后备军队;后备的发动机
- Saving power. Decreasing oil temperature, without pressure regulating valve, low noise, huge flow, having pressure offset variable pressure power. 动力等节约、减少油温上升。省略调压阀、低噪音大流量。有压力补偿、压力动力可变。
- Positively promotes TRT technology, for the furnace top pressure is bigger than 0.1 megabars large blast furnace, the TRT system should be installed. 积极推广高炉炉顶煤气余压发电技术(TRT),炉顶压力大于0.;1兆帕的大型高炉均应配装TRT系统。