您要查找的是不是:
- Load Balancing Strategy for Parallel Calculation and Time Cost Estimation 多块并行计算中负载平衡策略及时间成本估算方法
- What is included in a Landed Cost estimate? Landed Cost预算包括甚么内容?
- Assist PM for improving reliability of project cost estimate. 负责项目的成本分析和成本控制.
- The newly developed technology that reduce the time cost a lot. 新研发出来的方法极大的节省了时间。
- How can I calculate my shipping charges for use in the Landed Cost estimate? 我怎样计算我的托运费用,以便用于Landed Cost预算?
- Receive an immediate cost estimate for your shipment before shipping. 您可以在寄件前取得即时的预估费用。
- Appliable to various sizes of container,easy adjusting ,short time cost. 整机可适用不同规格的瓶子,调整简便,可在时间内完成。
- Cost estimate of the expense portion, i. e. the equipment and materials. 费用部分,即设备和原料的成本估计。
- Parametric and bottom-up cost estimation. 参数及自下而上成本估算法。
- time cost estimates 时间成本估计
- It is high time costing since it need to compute many determinant. 这是由于它需计算许多行列式的缘故。
- Costs Estimate For Trade Marks Application in the FRANCE. 法国商标注册申请费用。
- Parallel processing is a powerful way to reduce time cost in computation-intense task. 并行计算降低计算密集型计算任务时间开销的有力途径。
- Our Landed Cost engine provides you with a cost estimate of international shipments. 我们的Landed Cost引擎将为您提供国际货件的成本估算。
- Our vision is become world class injection moulder, we will always focus on technology, quality, time cost. 我们时刻关注产品的技术、质量、时效和成本,我们的目标是成为世界级的模具和注塑制造商。
- Be responsible for cost estimate, planning, contract management and resource allocation. 负责成本控制,项目计划,合同管理及人员分配。
- Compared with previous scheme, the proposed had two merits of low hardware overhead and low time cost. 与以往的方法相比,具有两个显著优点:低的硬件成本及低的时间开销。
- Third, a cost estimate for the project was needed covering both the building and future running of the system. 第三,需要对系统的建设和今后的运行进行一次项目费用概算。
- He is known for his hesitancy in such matters and his hesitation at that time cost him the championship. 对于这类事情他经常踌躇不前,这是尽人皆知的。那时候他的犹豫不决使他痛失冠军。
- Your Landed Cost estimate and actual shipment charges may vary for several reasons. 您的Landed Cost预算和实际托运费用不符可能有若干原因。