您要查找的是不是:
- Activity Based Costing (ABC) is the media in the conbination of ABCM and the new ABMS. 作业成本计算(ABC)是作业成本管理与作业管理新体系联结的中介。
- The basic idea of activity based costing is that products consume activities and activities consume resources. “产品消耗作业,作业消耗资源”是作业成本法的基本思路。
- Many accounting articles state that the activity based costing can provide more useful information, and correspondingly add value to the companies. 许多会计文章也认为,作业成本计算制度能够提供更为有用的信息,并因此而能够增加公司的价值。
- It is necessary to bring the principle of Activity?Based costing into the field of budget for exert the effect of the ABCM. 为充分发挥作业成本管理的作用,解决预算管理与作业管理"两张皮"的现象,有必要将作业成本原则扩展到预算领域。
- For better combination of Enterprise Resource Planning(ERP) and Activity Based Costing Management (ABCM), a resources-sorted ABCM model based on ERP was put forward. 为了使企业资源计划与作业成本管理更好地结合,提出了一种基于企业资源规划的资源分类型作业成本管理模型。
- The thesis has analysed Activity Based Cost Management (ABCM) and Target Costing (TC) and made them compare with the traditional cost management. 论文引用了作业成本管理法(ABCM)和企划成本管理法(TC),并与国内传统成本管理方法进行比较。
- Balance score card in strategic management and activity based costing in activity management are the significant techniques in strategic management accounting. 战略管理会计的平衡计分卡、于作业成本计算法的作业管理方法,是企业战略管理的重要工具。
- A dependence based cost testing (DBCT) algorithm and decision framework are proposed. (4) 提出了一种基于相关性分析的软件流水开销测试(DBCT)算法以及软件流水的决策框架。
- She skirted round the problem of the high cost. 她避而不谈巨额费用问题。
- Cost controluses the Activity Based Costing (ABC method) of traditional accounting forreference. It provides some suggestions about cost control in both partly andwholly as well. 成本控制主要借鉴了会计中的 ABC 法予以确认,并从局部与整体两个方面提出了控制成本的建议。
- The cost of travel to the far east is prohibitive. 到远东旅游的费用高的令人不敢问津。
- In point of cost, we'll have to discuss it at the next meeting. 至于费用方面,我们只好留到下次会议再讨论。
- The runner was retired put out at first base. 跑垒者于第一垒上被刺杀出局。
- The runner went to second base on a wild pitch. 一记瞎设让跑垒员跑上了第二垒。
- The wind whirled the dead leaves about. 风吹得枯叶在四处回旋。
- Chapter three focuses on designing the form of Activity Based Cost System (ABCS), which is composed by the ABC, ABCM and performance value system. 作业成本体系的框架设计是文章论述的第三个问题。 作业成本体系框架由作业成本计算体系的设计,作业成本管理的设计以及业绩评价系统三部分组成。
- The wind was whispering in the trees. 一阵风穿过树林沙沙作响。
- There are 26 letters in the English alphabet. 英语字母表中有26个字母。
- Foreign nationals were asked to leave the country. 外国侨民被要求离开该国。
- Chapter threefocuses on designing the form of Activity Based Cost System (ABCS), which iscomposed by the ABC, ABCM and performance value system. 作业成本体系框架由作业成本计算体系的设计,作业成本管理的设计以及业绩评价系统三部分组成。