您要查找的是不是:
- A test load was applied to the girder. 一个试验载荷作用于该梁上。
- Testing load charge-over between two main generator. 过电流脱扣试验二台主发电机负荷转移试验。
- IP switching is available only with Team Test Load Agent. IP切换仅适用于Team Test Load Agent。
- For test agents, the CPU speed and memory available will limit the test load. 对于测试代理,可用的CPU速度和内存将限制测试负载。
- One door off stacking capacity, racking test load, and one door off test load. 单面去除的堆放容积,堆压负荷测试和单面去除的堆压负荷测试。
- To set up controllers and agents, you need the Microsoft Visual Studio 2005 Team Test Load Agent installation disk. 若要安装控制器和代理,需要Microsoft Visual Studio 2005 Team Test Load Agent安装盘。
- It is an automatic test instrument,which can automatically impose test load,protract curves,analyze and process data. 它是一个能自动加载测试,自动拟合曲线,自动分析和处理数据的测试装置。
- Braking Test when laden: The braking track shall not be longer than 2.5 meters after a cute braking when the ruck is traveling in full speed with 1.5 M/T test load on the forks. 荷重时刹车检定:牙叉荷重1.;5吨砝码时,以全速(最高速)行驶,在紧急刹车时,其刹车痕迹不得超过2
- Through a quiescent load and racking load test, the working behavior of Tong Cheng He River Bridge under the test load is analyzed. 对采用体外索加固的通城河桥进行静载试验,比较加固前后桥梁在试验荷载作用下实际工作状态,测定结构的强度、刚度及抗裂性能,从而确认该加固方法的加固效果。
- On the other hand, researched FWD testing principle and performance and learned the infection of FWD test load to Rock-Filling Embankment backcalculation result. 另一方面则分析了FWD的测试原理及性能,认识到FWD的测试荷载影响了填石路基的模量反算结果。
- Braking Test when laden: The braking track shall not be longer than2.5 meters after a cute braking when the ruck is traveling in full speed with1.5 M/ T test load on the forks. 荷重时刹车检定:牙叉荷重1.;5吨砝码时,以全速(高速)驶,在紧急刹车时,其刹车痕迹不得超过2
- Before you start to install the controller or agents, review the installation guide, which contains information about how to install Visual Studio Team Test Load Agent. 在开始安装代理之前,控制器服务必须处于运行状态,以便代理可以自动向控制器注册自己。
- A simple test will show if this is real gold. 简单的试验就能证明这是否是真金。
- In addition, the relations between the test loads and calculated loads of the girders of actual bridge are analyzed. 同时,分析了试验荷载与实桥计算荷载之间的关系。
- The parameter measurement information section of the data sheet illustrates the test loads and waveforms that are used when testing the device (see Figure 10). 在测试器件时,数据手册的参数测量信息小节,举例说明测试负载和测试波形(参见图10)。
- Pupils who pass the test will be promoted to the next higher grade. 小学生只要考试及格就会升到高年级。
- We are testing the efficacy of a new drug. 我们正在测试新药的功效。
- TESTING LOAD OF COAL-MINING ROUND LINK CHAIN 水泥高强度链条矿用圆环链试验负荷
- He held the test tube in his hand thoughtfully. 他沉思地把试管拿在手里。
- It will be wise to go over your test paper again. 还是把您的考卷再检查一遍的好。