您要查找的是不是:
- Wushan Changjiang River Bridge is a half-through concrete-filled steel tube arch bridge. 摘要巫山长江大桥是一座中承式钢管混凝土拱桥。
- Based on the characteristics of the bridge,the aerostatics instability of long-span concrete-filled steel tube arch bridge is analyzed. 针对大跨径钢管混凝土拱桥的特点,对其空气静力失稳问题作了理论和数值计算分析。
- CHEN Feng,HU Da-lin.Aerostatics Stability of Long-span Concrete-filled Steel Tube Arch Bridge[J].Journal of Chang'an University:Natural Science Edition,2006,26(2):42-46. [4]陈峰;胡大琳.;大跨径钢管混凝土拱桥非线性静风稳定性[J]
- In the design of aeroelastic model of long-span concrete-filled steel tube arch bridge, the method of using an equivalent mandril to simulate the stiffness of whole arch rib is mainly used at present. 摘要对于超大跨度钢管混凝土拱桥,由于受模型缩尺比所限,通常在气弹模型试验中不能单独模拟出拱肋中单根钢管的刚度,目前常采用集中刚度法用一个芯棒模拟整个钢管桁架的刚度。
- dumbbell concrete filled steel tube arch bridge 哑铃型钢管砼拱桥
- long-span concrete filled steel tube arch bridge 大跨度钢管混凝土拱桥
- long-span concrete-filled steel tube arch bridge 大跨径钢管混凝土拱桥
- concrete-filled steel tube arch bridge 钢管混凝土拱桥
- Concrete -filled steel tube arch bridge 钢管混凝土拱桥
- The long- span concrete steel tube arch bridge 大跨度混凝土钢管拱桥
- concrete filled steel tube arch bridge 钢管混凝土拱桥
- concrete-fillede steel tube arch bridge 钢管混凝土拱桥
- concrete-infilled steel tube arch bridge 钢管混凝土拱桥
- cable-stayed concrete filled steel tube arch bridge 斜拉钢管混凝土拱桥
- ONE KIND OF NEW TYPE CONCRETE- FILLED STEEL TUBE ARCH BRIDGE COMPUTING METHOD 一种新型的钢管混凝土拱桥计算方法
- Study of Alignment Control for Concrete Filled Steel Tube Arch Bridge 钢管混凝土拱桥线形控制技术研究
- Design of Long Span Half-Through Concrete-Filled Steel Tube Arch Bridge 大跨度中承式钢管混凝土拱桥设计
- Aerostatics Stability of Long-span Concrete-filled Steel Tube Arch Bridge 大跨径钢管混凝土拱桥非线性静风稳定性
- The Modeling Analysis of Concrete Filled Steel Tube Arch Bridge with No Wind Bracing System 无风撑钢管混凝土拱桥建模分析
- Design and Analysis of Test Model of Double-Deck Concrete-Filled Steel Tube Arch Bridge 双层桥面钢管混凝土拱桥试验模型设计及理论分析