您要查找的是不是:
- reinforced steel concrete bridge 钢筋混凝土桥梁
- Causations Of Affecting Reinforced Steel Concrete Bridge Durability 影响钢筋混凝土桥梁耐久性的原因
- steel concrete bridge 钢筋混凝土桥梁
- arched steel concrete bridge 钢筋混凝土拱桥
- Its steel and concrete bridge towers, the tallest in the world, stand at 300.4 meters. 这座桥的钢筋混凝土桥塔高度达到300.;4米,为世界最高桥塔。
- Failare Analysis and Protection of Paving of Cement Concrete Bridge. 水泥砼桥面铺装病害原因分析及防治。
- According to principle of the nonlinear finite element method for steel concrete, the thesis analysis AUHAN Bridge for reinforcement and increasing load in theory through finite element software ADINA. 本文根据钢筋混凝土非线性有限元的工作原理,利用有限元软件ADINA对敖汉桥的加固、提载进行了理论分析。
- Said precast concrete bridge deck assembly has precast concrete bridge deck, end surface loop type steel reinforcement, bottom surface shear resistant slot, and bottom surface shear resistant unit. 所述预制混凝土桥面板组件具有预制混凝土桥面板、端面环型钢筋、底面抗剪槽、底面抗剪器;所述钢梁组件具有直立钢梁、钢梁上翼缘板、连身钢板侧模、抗剪器、连身钢丝网端模;
- Straddle-type single-track beam of Press Steel Concrete (PC) possess the action of bearing, orienting and stabilizing. 跨座式单轨PC(预应力混凝土)轨道梁桥结构具有承重、导向及稳定的作用。
- People used to cross the river by ferry,but now here is built a new concrete bridge. 从前人们在这里常乘渡船过河,然而现在这里已经建起了一座新的混凝土大桥。
- Nonetheless, I have to consider the following things:一、whether I should use steel tubes or steel concrete as underprop. 但是有几点是我不得不考虑的:一、是用钢管做支撑还是用钢精水泥柱作支撑。
- Cedar Bridge sat fifty yards upstream from and parallel to the new road and its concrete bridge. 杉树桥与新的公路平行,在河上游的五百码处,是水泥桥。
- People used to cross the river by ferry, but now here is built a new concrete bridge. 从前人们在这里常乘渡船过河,然而现在这里已经建起了一座新的混凝土大桥。
- And the utility skill and the initially drafted three schemes of the sub model in concrete bridge box cantilever plate are analyzed. 分析初拟的三种局部精细分析技术实施方案,总结局部精细分析技术在混凝土箱梁悬臂板空间数值仿真中的应用技巧。
- UFA-HPC preparing by optimization meet the requirements of railway prestressed concrete bridge girder. 满足铁路预应力混凝土桥梁的要求。
- Bituminous pavement on concrete bridge is of a complex property because applied loads give rise to stress response. 混凝土桥面的沥青铺装层在外部荷载作用下的应力比较复杂,高温稳定性是铺装层材料的一项重要指标。
- Brito J D,Branco F A,Theft-Christensen P, et al.An Expert System for Concrete Bridge Managment. 王永平;张宝银;张树仁.;桥梁使用性能模糊评估专家系统
- Taking the workboat wharf berthing members in a wharf extension project as an example, it introduces the application and structural characteristics of shape steel concrete structure in wharf berthing member design. 以扩建工程中工作船码头靠船构件为例,介绍型钢混凝土结构在码头靠船构件设计中的应用及结构特点。
- The concrete walls are reinforced with steel rods. 混凝土墙是用钢筋加固的。
- It's a bridge of steel framework. 那是座钢铁结构的桥梁。