您要查找的是不是:
- Construction of sewers and the north-east river wall and site formation work at Tai O, the road improvement works for Cheung Chau Old Town, and the reclamation, road and drainage works at Yung Shue Wan, Lamma Island are in progress. 大澳污水渠与东北河堤建造工程及地盘平整工程、长洲旧墟道路改善工程,以及南丫岛榕树湾的填海、道路及渠务工程,均在进行中。
- Construction of sewers and the north-east river wall and site formation work at Tai O,the road improvement works for Cheung Chau Old Town,and the reclamation,road and drainage works at Yung Shue Wan,Lamma Island are in progress. 大澳污水渠与东北河堤建造工程及地盘平整工程、长洲旧墟道路改善工程,以及南丫岛榕树湾的填海、道路及渠务工程,均在进行中。
- site formation works 场坪工程
- Perimeter channels shall be provided at the site boundaries to intercept storm run-off from off-site. These channels shall be constructed before site formation works and earthworks; 应在工地界线设置周边水道,以阻截从工地范围外流入的雨水径流,这些水道应于进行工地开拓和土方工程之前建好;
- Site formation and infrastructure works will be implemented in phases commencing in mid-1999 for completion by 2003. 土地平整及基础建设工程,将于一九九九年年中开始分期实施,预期于二零零三年或之前完成。
- Site formation of the area was largely completed in mid-1998. 相关的大部分地盘平整工程,已于一九九八年年中完成。
- Site formation and infrastructure works for Phase 2 are in progress and are scheduled for completion late in 2000. 第II期发展计划的地盘平整及基础建设工程在进行中,定于二零零零年底完成。
- Any site formation, street works, road, motorway, railway, tramway, cableway, aerial ropeway, or canal. 何工地平整、街道工程、道路、行车道、铁路、电车轨道、缆车轨道、缆道、架空缆车轨道或渠道。
- Construction work will involve site formation and earthwork excavation, which will necessitate the removal of spoil. 建筑工程包括地盘平整和挖掘土方工程。这些工程将有需要进行移除废土。
- Servicing and minor formation works are being carried out for villages at Ngau Pei Sha, Chap Wai Kon and To Shek. 此外,当局现正为牛皮沙、插桅杆及多石的乡村进行公用设施及小规模平整工程。
- The GIF file format works best with graphics that contain a limited number of colors, and consist of lines or text. GIF文件格式最适合处理颜色数量有限的、由线条或文本组成的图片。
- The largest use of explosives during the year was for quarrying and site formation works. The overall consumption of explosives was 2100 tonnes. 年内使用爆炸品最多的是采石工程和地盘平整工程,总消耗量为2100公吨。
- The largest use of explosives during the year was for site formation and quarrying works. The overall consumption of explosives was 2 853 tonnes. 在一九九九年,地盘平整工程和采石工程使用的爆炸品最多,总消耗量为2853公吨。
- Servicing and minor formation works are being carried out for villages at Ngau Pei Sha,Chap Wai Kon and To Shek. 此外,当局现正为牛皮沙、插桅杆及多石的乡村进行公用设施及小规模平整工程。
- The Good: Fantastic array of characters to fight, befriend, and recruit; classic battle format works well; character and battle customization additions add depth. 优点:大批奇异的人物角色可以与之战斗,交友或者招募其为队友;经典的战斗阵型依然有效;新增的可定制的人物和战斗增加了游戏的深度。
- Decontamination, demolition and removal of buildings and apron pavement, and site formation in North Apron of Kai Tak Airport. 为启德机场北面停机坪进行除污、拆除建筑物和机坪行人道、以及土地平整工程。
- Fantastic array of characters to fight, befriend, and recruit; classic battle format works well; character and battle customization additions add depth. 大批奇异的人物角色可以与之战斗,交友或者招募其为队友;经典的战斗阵型依然有效;新增的可定制的人物和战斗增加了游戏的深度。
- It was observed that the rates of main stem growth and fruiting site formation decreased by over 30% when soil relative water content (SRWC) was lower than 60% as against control plantsj growth virtually ceased when SRWC fell below 40%. 花铃期土壤相对含水量在60%25以下时,棉花主茎平均日生长量和果节出现速率比不缺水的对照降低30%25以上; 土壤水分低于40%25时,生长基本停止。
- The monument was moved bodily to a new site. 纪念碑整个迁到一个新场址。
- Is it safe to site the power station here? 在这建造发电厂安全吗?