您要查找的是不是:
- joint with single cover plate riveting butt 单搭板铆钉对接
- double cover plate riveting 双盖板铆接
- cover plate rivet 盖板铆钉
- The injection mould for a duplicator cover plate is designed. 设计了复印机盖板的注塑模具。
- Reattach cover plate to make an air and water tight seal. 重新固定盖板,并紧密密封防止空气和水通过。
- Single cover retaining screw mounted on top of the indicator for easy access. 在流量指示器上安装一个盖子固定螺丝,便以打开进入。
- Single cover retaining screw mounted on top of the flow switch for easy access. 在流量开关上安装一个盖子固定螺丝,便以打开进入。
- Bolted cover plate to protect seal and cylinder from the ingress of debris. 上盖板可防止杂物进入缸筒损坏密封。
- Disconnect the hose from the bottom cover plate to the relief valve. 断开底部盖板到安全阀上的软管。
- Shanghai Intemational Conference Center, super huge diameterShell with single cover Dual-ball Steel Construction. 上海国际会议中心超大直径单层网壳钢结构制作。
- All internal parts shall be accessible through a single cover on the valve assembly securely held in place by a two-bolt grooved coupling. 所有内部部件应该可以通过阀门总成上的一个阀盖接近,这个阀盖采用两个螺栓槽联结器固定。
- Remove the cover plate of the relief valve by removing the four connecting screws. 通过拆卸四个连接螺丝来拆卸安全阀盖板。
- If you open the cover plate of your cell phone, you'll see a rectangular LCD on its backside. 把手机的盖板打开来,背面就是一整片长方形的液晶萤幕。
- The major products such as open type blind rivet, sealed type blind rivet, multigrip type blind rivet, grooved type rivet, colour plated rivet and so on. 我司专门生產铆钉,主要產品有:开口型抽芯铆钉、封闭型抽芯铆钉、双鼓型铆钉、击芯铆钉、以及各种彩色铆钉等。
- Before installing cover plate, a continuity test should be performed to assure that switches are properly set. 在安装盖板之前,应该进行断路检查测试,以确保开关正确设置。
- Adjust the Mounting Bracket so that the Sensor sits flush against the Cover Plate. 请调整安装架使得感应器与盖板处于合适的位置。
- Fitting 272 has an opening 274 therethrough that communicates with channel 266 and recess 264 in cover plate 262. 管接头272有一通道274经过,连通盖板262上的通道266与凹处264。
- Slowly open all ball valves to relieve air and water pressure. Loosen bolts on groove coupler and remove groove coupler and cover plate from valve body. 慢慢开启所有球阀,释放空气和水压力。松懈沟槽状联结器上的螺栓,从阀体上拆卸沟槽状联结器和阀盖板。
- Vin stamped onto neck of frame further accented by matching vin stamped on brass vin plate riveted to frame neck. vin或盖章颈部帧进一步浓墨重彩的匹配vin或盖章黄铜vin或钢板铆接诬脖子。
- Slowly open all ball valves to relieve air and water pressure. Loosen bolts on groove coupler and remove groove couple and cover plate from valve body. 慢慢开启所有球阀,释放空气和水的压力。松开沟槽连接器上的螺栓,从阀体上拆卸沟槽连接器和盖板。