您要查找的是不是:
- The ship lock scross and under the bridge consists of cofferdam, lock gate, lock chamber, water pumping system and lock gate opening and closing system. 当巨型轮船遇到净空高度不够的已建大桥时,可进入船闸室,开启抽水,使闸室内水位下降至船能够通过桥下净空为止。
- Application of flux - cored wires in"San Xia ship lock gate" welding 药芯焊丝在“三峡永久船闸人字门”上的应用
- The lock keeper closed the lock gate. 船闸管理员关上了闸门。
- Survey Control for Mounting Permanent Ship Lock Gate for the Project of the Three Gorges on the Yangtze 三峡工程永久船闸人字门安装测量控制
- ship lock gate 船闸闸门
- Water went rushing through the lock gates. 水流经水闸时十分湍急。
- It has effect on berthing and navigation conditions of ship(fleet) and has bad effect on lock run mode and miter lock gate. 但其上下级船闸采用不同运转方式时,所产生的非恒定流水流条件十分复杂,严重时将影响船舶(队)停泊和航行条件,还会对船闸运转及人字闸门产生不利影响。
- The standard of allowable mooring force for ocean ship lock is also discussed. 并针对海船闸的船舶允许系缆力标准进行了探讨。
- But the police were baffled by the locked gate. 但是警察被锁着的大门弄得困惑不解。
- All restricted areas must be fenced with a lock gate to prevent access by unauthorized persons. 所有限入区域必须围起来并配有门,锁以防止非指定人员进入。
- Pass the ship locks of the gorges dam. 经过三峡大坝船闸。
- The ship locked into the new canal. 船通过水闸驶入新运河。
- This double lock gate provides the ultimate in security to prevent accidental openings, while allowing the latch gate to be operated quickly and easily with one hand. 这双重锁门提供防止偶然的打开,允许容易一手快速操作闩门。
- The conclusion has been proved reasonable by the engineering practice of Zhuzhou navigation power junction ship lock. 株洲航电枢纽船闸的工程实践表明分析及建议是合理的。
- Sluice price; sluice gate price; lock gate A theoretical cif price used in calculating European Communities supplementary levies on imports of pork, poultry and eggs. 闸口价格,最低进口价格一种理论上的到岸价格,用以计算欧共体对进口猪肉、家禽和蛋品的附加税。
- Adopt in all kinds of vehicle such as bike lock, autobike lock, car lock, train lock, ship lock& plane lock etc. 适用于各类车、船上使用的锁、如自行车锁、摩托车锁、汽车锁、列车锁、船舶锁、飞机用锁等。
- The ship lock is the most widely used and prospectives also the important type of navigation architectures. 船闸是当前世界上应用最广泛、前景最广阔、也是最重要的通航建筑物型式。
- The acceptance test results showed that the construction of pre stressed anchorage cable of permanent ship lock meets the requirements of design. 验收试验成果表明,永久船闸预应力锚索的施工符合设计要求。
- At his command, CTGPC has reached the two TGP construction milestones of initial water impoundment of reservoir and ship lock operation in 2003. 在他的领导和指挥下,2003年三峡工程顺利实现了初期蓄水和船闸通航两大目标。
- Ship lock with double-hinged soleplate, which is developed based on the integral ship lock, is widely applied on silt-sandy foundation and fine-sandy foundation. 双铰底板式闸室结构是在整体式闸室基础上发展起来的一种型式,一般适用于粉砂、细砂地基,应用十分广泛。