您要查找的是不是:
- The thesis, with its discuss and study of the aspect, makes reference for future EPB shield driven construction. 展望城市地铁发展远景,盾构工法将被广泛应用,本文在这方面探讨与研究,为今后的土压平衡盾构施工提供参考与借鉴。
- Prospecting the development of city metros, construction with shield driven method will be widely applied. The thesis, with its discuss and study of the aspect, makes reference for future EPB shield driven construction. 展望城市地铁发展远景,盾构工法将被广泛应用,本文在这方面探讨与研究,为今后的土压平衡盾构施工提供参考与借鉴。
- Study on Shield Driving Construction Near Arterial Pipelines 盾构近距离穿越重大管线施工技术研究
- Both continuous-jointed segmental lining and stagger-jointed segmental lining are used in shield driven tunnels. 通缝、错缝管片在国内盾构隧道施工中均有运用,关于两种衬砌形式孰优孰劣的争论一直存在。
- The shield driven tunnel of Yuexiu Park to Sanyuanli in No. 2 line of Guangzhou Metro has been built and used in informal business in 2002. 摘要广州地铁二号线越秀公园-三元里区间盾构隧道已于2002年建成并投入试运营。
- Some experiences on Guangzhou Metro are summed up and some suggestions on the present design of shield driven tunnel are put forward. 总结了广州盾构隧道设计中的成功经验,并对当前盾构隧道设计中有关问题提出了建议。
- In Alberta, oilsands investment will drive construction activity in 2005. Construction output is projected to grow by 2.7 per cent in 2004 and to soar by 10.7 per cent in 2005. 在艾伯特省,2005年石油工业的投资将带动整个建筑业,预计建筑业2005年的增长幅度将从2004年的2.;7%25上升到10
- Technic of Import Shield Driven Machine 盾构掘进机引进技术
- From the principles of momentum, a calculation equation has been derived for the sunken boat load on underwater sunk tube tunnel or shield driving tunnel. 从动量原理出发导出水底沉管隧道和盾构隧道的沉船荷载计算公式;以某河口附近可能沉船情况为例,计算沉管和盾构隧道的沉船荷载。
- Based on the analysis of the inadequacy of the lifting capacity of piling barge in large-diameter prestressed concrete pipe pile driving construction, the measure of applying buoyancy generated by cavity drainage to remedy the inadequacy is put forward. 摘要针对混凝土大直径管桩沉桩施工时打桩船吊装能力存在不足的问题进行了分析,提出了利用管桩空腔排水产生的浮托力来弥补的措施。
- The construction stage entire process construction cost control is refers to construction cost engineer in the entire construction stage,to project construction cost whole implementation dynamic,beforehand,driving construction cost control. 施工阶段全过程造价控制是指造价工程师在整个施工阶段,对工程造价整体实施动态的、事先的、主动的造价控制。
- Lead aprons shield people from radiation. 铅做的工作裙可使人免进辐射。
- Design and construction of shield driven tunnel crossing the station yard of Guangzhou Railway Station 盾构隧道穿越广州火车站站场的设计与施工
- Study on load test of segment joint in shield driven tunnel 盾构隧道管片接头荷载试验研究
- He lied to the court to shield his friend. 他对法庭说谎以包庇自己的朋友。
- I've never seen a car being driven so recklessly. 我从没见过有人开车这么卤莽。
- The sword glanced off the shield. 剑擦过盾牌。
- How can I drive away these feelings of sadness? 我该怎样做才能驱散忧伤?
- Bill wave his hand to us and then drive away. 比尔向我们挥手告别后开车走了。
- The engines are driven by steam. 这些发动机是由蒸汽驱动的。