您要查找的是不是:
- Keywords compound roof coal seam;integrative mechanisation tunneling;support with anchor;beam and net;united suport; 复合顶板煤层;综合机械化掘进;锚梁网支护;联合支护;
- roof coal seam 顶煤
- According to the conditions of seam No.5 in Shifengshan Coal Mine,longwall face roof coal drawing method is chosen. 通过对峙峰山煤矿5号煤采煤方法的设计,提出了采用综采放顶煤法回采5号煤。
- Analysis and Control Countermeasures of Fracture Water Irruption in Roof Sandrock of No.4 Coal Seam in Mine of Hengyuan Co. 恒源公司矿井4煤层顶板砂岩裂隙水突水分析及治理。
- The test results show that the drawing interval of 1.5 m is helpful for controlling dead-unconsolidated thin sandstone of coal seam roof and reduce sand ratio of drawn top-coal. 试验结果表明,放煤步距采用三采一放有利于控制顶板极松散细砂岩,降低放出顶煤的含砂率。
- Part roof fall accident cause is analyzed in flase top mining in No.5 Coal Seam of Pinggang Coal Mine.The prevention and cure measures are pointed out. 通过对平岗煤矿5%23煤在托伪顶回采时发生的局部冒顶事故原因的分析,提出了解决该问题的防治措施。
- Introduced the technology to control the roof in the gob with man-forced deep drilling and explosion in 14#coal seam as well as to analyze the effect. 介绍14号层人工强制深孔爆破处理采空区顶板的技术以及在实践中得出的经验,并对其效果进行了分析。
- Complex coal seam roof and floor conditions made stope support system low stiffness,poor stability and a very adverse the exploitation environment. 复杂的煤层顶底板条件使得采场支护系统刚度低、稳定性差,开采环境十分恶劣。
- The coal seam tunnel of compound mudstone roof of large span is the tunnel that is violent out of shape,roof is easy falling and safeguard is very difficult. 大跨度复合泥岩顶板煤层巷道是围岩变形剧烈且顶板易冒落、极难维护的巷道。
- Coal miners; coal seams; coal haulers. 煤矿工; 煤层; 运煤工
- Water channels include coal seam roof and floor mining induced fissures,faults,karstic subsided columns,Quaternary scuttles,fissure concentrated zones and badly sealed boreholes. 充水通道包括顶底板采动裂隙、断层、岩溶陷落柱、第四系天窗、裂隙密集带及封闭不良钻孔等,其中顶底板采动裂隙、断层、岩溶陷落柱为主要导水通道。
- Mechanical model for the elastic thick outrigger of roof coal is set up. 建立了顶煤弹性深梁力学模型,分析了顶煤应力分布及顶煤破坏形式。
- The testing results of working face coal samples and roof impact tendency indicated that the coal seam belongs to high impact tendency and has pressure bumping possibility. 工作面煤样和顶板冲击倾向性测试结果表明,该煤层属于高冲击倾向性煤层,具有发生冲击矿压的能力。
- One of the crucial elements influencing the rock burst is the structure of roof rock stratum, especially the flinty and thick sandstone roof over the coal seam. 顶板岩层结构,特别是煤层上方坚硬、厚层砂岩顶板是影响冲击矿压发生的主要因素之一。
- Coal seams intermixed with iron ore. 煤层和铁矿混杂在一起。
- Whereas the character of roof's movement and falling caused by coal seam is shallow in Shen-dong mine district, the workface advance rate must be picked up dur... 鉴于神东矿区煤层埋藏浅而引起的顶板移动、跨落特点,在回采过程中加快工作面推进速度,能够比较有效的控制顶板岩层。
- From the characteristic of prop and actual conditions of coal seam and roof in Datai pithead, the support force of the dense prop in 揝ichuan Method?is calculated. 从单体液压支柱的特性出发,结合大台井实际的煤层和顶板条件,计算了俯伪斜走向分段密集采煤法密集柱的支撑力。
- The Gaussian curvature of No.3 coal seam in Qinshui basin is calculated. 计算了沁水盆地3号煤层的高斯曲率。
- Factors affected coal seam permeability change and its law is analyzed. 分析了煤层透气性变化的影响因素及变化规律。
- This technique has been used successfully in the air-return gate oJ" 1310 fully mechanized roof coal caving face in Zhangcun Coal Mine. 该项研究在漳村1310综放面回风巷的工程实践中得到了成功应用和检验。