您要查找的是不是:
- Risk Analysis of Engineering Construction Project. 工程建设项目的风险分析。
- Adds risk analysis to feasibility assessment. 增加风险分析到可行性评估中。
- Financing, cash inflow and outflow management and risk analysis. 资金的筹划与使用及其安全风险性分析。
- Banking - Customer affinity analysis, credit risk analysis. 银行客户关系分析,信用风险分析。
- Overall process of risk analysis and risk evaluation. 风险分析和风险评价的整个过程。
- B. Re-evaluate the risk analysis and contingency funding. 重新评估风险分析结果和应急资金。
- The risk analysis ranges include alpaca. , llama, guanaco, and vacuna. 进境风险分析范围除驼羊(alpaca)外,还包括属于美洲驼的羊鸵(llama)、原驼(guanaco)、驼马(vacuna)。
- EPPO recommends actions based on Pest Risk Analysis (PRAs) for new phytosanitary risks. 植保所建议的行动基于有害生物风险分析(广播道);新的检疫风险.
- The risk analysis methods include BEP analysis,sensitivity analysis and probability analysis. 风险分析的方法主要有盈亏平衡分析、敏感性分析和概率分析三种。
- A. You will evaluate the risks and assign probabilities and impacts using Qualitative and/or Quantitative Risk Analysis. 你将对风险进行评估并用定性和/或定量风险分析来对概率和影响赋值。
- Risk Analysis and Economic Evaluation of Oil and Gas Exploration Project with Real Option Method II. 油气勘探风险分析与实物期权法经济评价2。
- Be responsible for risk analysis for various workshop posts, and making protection measures. 负责车间岗位风险分析并制定防护措施。
- Has the company undertaken a corruption risk analysis of stores-related computer systems? 公司有否就有关存货的电脑系统进行贪污风险分析?
- Mathematical programming based methods have been applied to credit risk analysis and have proven to be powerful tools. 在银行以及金融相关产业,信用风险分析已日渐重要。 当前基于数学规划(Mathematical programming)的分析方法已成为信用风险分析的有力工具。
- CHA89 Robert Charette 1989.Software Engineering Risk Analysis and Management.New York, NY: McGraw-Hill. 从实用的角度来看待风险管理。
- The accidents with high risks are described and analyzed in the accident risk analysis table and the risk rank after the suggested measures are adopted in the calculation. 对风险等级高的事故,在事故风险分析表中进行了描述和分析,计算了采用建议措施后的风险等级。
- The Monte Carlo stochastic modeling method is an important method in the risk analysis of mining investment. 蒙特卡洛随机模拟法是矿业工程投资经济评价风险分析中的一种重要方法。
- The mean time to repair (MTTR) is one of the main indexes for system's reliability analysis and risk analysis. 串联系统的特点是串联元件中任一部分(元件)失效都可导致系统失效。
- Risk analysis should follow the principle of "root cause analysis" and adopt different framework. 风险分析应遵循“根原因分析”的原则,可以采用不同的分析框架。
- The detailed risk analysis consequently sees the aetioporphyrin file the accessories four. 详细的风险分析结果见本文件附件四。