您要查找的是不是:
- risk of construction period 施工期风险
- Preliminary discussion on the risk of construction quality control. 浅谈公路工程中施工质量控制风险。
- The project mainly includes earthwork and stone project, construction period short, simple form of construction work, and less construction machinery. 工程主要是土方和石方工程,施工期短,施工方式简单,施工机械少。
- By guaranteeing the project quality and work environment, it expedites the speed of construction, shortens construction period by 3 months. 在保证工程质量和工作地区环境的前提下,加快了施工的进度,缩短了约3个月的工期。
- Term of construction: Construction period of the project mainly includes time for research, enacting classes and getting government approval, which normally takes 6 to 8 months. 建设期限:项目建设期主要为项目研究及合同与章程制定与报批时间,约需要6-8个月时间。
- I don't want to run the risk of meeting John. 我可不想冒遇见约翰的危险。
- Because of construction period,the crane girder is often precast into concrete components in the construction of powerhouse,and is put in place by means of installation and splice. 在水电站厂房工程施工中,因工期需要,经常将吊车梁预制成混凝土构件,然后通过安装拼接的方法就位。
- He saved my life at the risk of losing his own. 他冒着生命危险救了我。
- In consideration of construction period and cost, the article advocates that the combination of foundation pit support and concrete jacking can reach sound results for quicksand treatment. 文章从工期和成本两方面进行分析,认为将基坑支护和人工挖孔桩的流砂治理相结合取得较好效果。
- Could you cover the Risk of Breakage for us? 你们可以为我们加保破碎险吗?
- The house/highway is in course of construction. 该房子/公路正在施工中。
- He saved my life at the risk of his own. 他冒着自己的生命危险救了我的命。
- This highway is in course of construction now. 这条公路目前正在修建中。
- In a greenfield or a brownfield project, the threshold question is, who bears the risk of construction not being completed to agreed specifications and performance criteria, on budget and on schedule? 就绿地投资和褐地投资而言,最基本的问题在于,由谁来承担项目建设没有按照商定的规格和履约标准,以及没有在商定的预算和时间表内完成的风险?
- Risk management is one of the very important aspects of construction project management, and risk indices are one of the very important contents reflecting the risk of construction project. 风险管理是建设项目管理的一个非常重要的方面,而风险指标是反映建设项目风险状况进行风险分析的一个重要内容。
- At the risk of sounding ungrateful, I must refuse your offer. 我甘受拂逆盛情之嫌,也必须谢绝你的提议。
- To minimize the risk of burglary, install a good alarm system. 安装可靠的报警设备以减低被盗的风险。
- Sometimes he went after these herbs at the risk of his life. 有时他得冒生命危险来找这些草药。
- The construction period is Only 2.5 Years. 全部工程工期需要2.;5年。
- According to the statistical data demonstrated, major part risk of constructional projects are from to policy-making stage fault. 据统计资料显示,建设工程项目的绝大部分风险,都源自于决策阶段的失误。