您要查找的是不是:
- How do resource assignments drive the schedule? 资源分配如何驱动日程?
- Only actuals for enterprise resource assignments can be protected. 只能保护企业资源分配的的实际值。
- If you want the Resource Substitution Wizard to assign proposed (soft booking: A resource assignment type that can be used for planning purposes. 如果希望“资源置换向导”分配建议的(软预订:一种资源分配类型,可用于制定计划。
- To enter overtime work for additional resource assignments, repeat steps 6-7. 若要为其他资源分配输入加班工时,请重复步骤6-7。
- To display additional information about the tasks shown in the Network Diagram view or about the resources assigned to those tasks. ,以显示有关“网络图”视图中所显示的任务或已为这些任务分配的资源的其他信息。
- Than work, you can use the Task Usage view to display the cost of each resource assigned to a task over time. ,则可使用“任务分配状况”视图显示为任务分配的每个资源在一段时间内的成本。
- To account for these differences, Project uses units (units: The quantity of a resource assigned to a task. 为了解决这些差异,Project使用单位(单位:分配到一项任务的资源的数量。
- Are the skills of a resource an important factor in determining resource assignments? 确定资源分配时,资源的技能是一个重要的因素吗?
- Front end the phonovision system the signal enters the assignment network after the amplifier, the assignment transmission system uses the coaxial cable radio frequency transmission mode. 电话电视系统前端信号经放大器进入分配网络,分配传输系统采用同轴电缆射频传输方式。
- To update actual work for a resource assignment in a different time interval (for example, weekly or monthly) you can change the timescale. 若要更新资源分配在不同时间间隔内(如每周或每月)的实际工时,请更改时间刻度。
- The Resource Usage and Task Usage views display the task and resource assignments with indentations similar to those of subtasks. “资源使用状况”和“任务分配状况”视图与子任务类似,以缩进方式显示任务和资源分配。
- For instance, if a resource assigned to a task also incurs travel costs, the travel costs can be added as a fixed amount to the same task. 例如,如果分配给某任务的资源会涉及差旅成本,该差旅成本可以作为固定量添加到该任务中。
- The act of assigning absolute addresses to a program. 将绝对地址分配给某个程序的操作过程。
- If no actuals have been reported on the task, the entire task is reassigned to the new resource, and the original resource assignment is removed. 如果没有报告该任务的实际值,则整个任务都会重新分配给新资源,而原始资源分配将被删除。
- Do you hope to be assign to work in country? 你希望分配到农村工作吗?
- After the cost resource is assigned to a task, you can enter costs for the resource assignment by using the Task Usage view. 将成本资源分配给任务后,可以通过使用“任务分配状况”视图输入资源分配的成本。
- If you want to update actual accrued resource assignment costs on a daily basis, on the Format menu, point to Details, and then click Actual Cost. 如果希望逐日更新实际累计的资源分配成本,请指向“格式”菜单上的“详细信息”,再单击“实际成本”。
- You can plug into the national computer network. 你可以接通全国计算机网络。
- We cannot assign a cause to these events. 我们无法说明发生这些事件的原因。
- She gave me a diagram of railway network. 她给了我一张铁路网图解。