您要查找的是不是:
- random sampled parts 任意抽取件
- There are many applications for random sampling. 随机抽样有许多应用场合。
- Methods Stratified chester random sampling. 方法采用分层整群随机抽样的调查方法。
- The method uses small random samples and the limits of a hyperbola. 该方法采用了小范围随机抽样和双曲线的极限。
- Conduct first article inspection and random sampling inspection. 进行首件检验和抽查检验。
- The interviews were given to a random sample of students. 随机抽选出部份学生进行了采访。
- The opinion poll was based on a random sample of adults. 这次民意测验结果是在对成年人的随机抽样调查基础上得出来的。
- Some retailers pull 3-4 random samples from each product group. 一些零售商随机从每批产品中抽取3-4件样品。
- Methods use a random sample of 1000 records to discretize data. 方法使用1000个随机记录样本来离散化数据。
- We did the random sampling of five pieces per batch of 100. 我们在每批一百件的货品中取五件随机抽样。
- Has tooling already been released that I can get some sample parts to build into A? 模具已经准备好了吗,那样我就可以拿到一些样品组装进A?
- The non-native norming group was a stratified random sample of 514 callers sampled from a larger group of more than 3,500 non-native callers. 非本地的标准测试人群共有514位,他们是从3500多位非本地的电话测试者中分层次地随机挑选出来的。
- To analysis the effective components of CMO of different ages,sampling parts, original and regenerate plants in Enshi Hubei. 对湖北恩施地区不同树龄、不同取样部位以及厚朴原生植株与再生植株的有效成分进行了分析。
- Method The sampling of individuals was done by the lamination random sampling. 方法采用分层随机抽样法进行人群抽样,用改良加藤氏法粪检华支睾吸虫虫卵。
- DESIGN: Clustering stratified random sampling, cross-sectional survey. 设计:整群分层随机抽样,横断面调查。
- Then calculates the equivalent stress according to the random samplings. 其次,按不同的里程从全程数据中抽取数据并计算等效应力幅;
- The only issue is that the inspection results did not list the sample part number, so we are trying to obtain that information now. 唯一的问题是检查结果没有列出样品的零件号码,我们现在想获得这部分信息。
- HPLC fingerprints of phenolic constituents of CMO of different ages, sampling parts, original and regenerate plants in Enshi Hubei were studied as well. 对湖北恩施地区不同树龄、不同取样部位以及厚朴原生植株与再生植株的酚性成分HPLC指纹图谱进行了研究。
- A. The tooling supplier will submit sample parts for first parts approval, along with a full part layout and a ballooned part drawing to the Project Manager. 当供应商提供首件承认样品时,同时向项目经理提供一份完整料带及相关的产品图纸。