您要查找的是不是:
- quantity bill price 工程量清单计价
- quantity bill pricing 清单计价
- Pondering on Bidding in a Model of Construction Quantities Bill Pricing 工程量清单计价模式下招投标的思考
- The fabrication cost mode by project quantity bill is popularly practiced in the fabrication cost management of international projects. 工程量清单计价模式是国际工程造价管理的通行做法。
- The quantity billed must equal the quantity received. 发表的数量必须等于收据的数量。
- The project work bill price is reformed inevitable in our county construction engineering price and the convention requirement of international construction project. 工程量清单计价是我国建筑工程造价改革的必然;是与国际建筑工程造价贯例接轨的要求;它的实施必将推动我国工程造价、招标投标和工程管理的全面改革.
- For the risk only in the large-scale engineering project, it concludes unequalization quoted price and valuation mode of quantities bill. 一般出现在大型工程项目中的风险,主要是投标方不平衡报价和工程量清单计价模式给我国的大型工程项目业主带来的风险。
- ACTUALIZATION PRICE CONTROL OF ENGINEERING QUANTITY BILL 实施工程量清单报价的造价控制
- Study of Quantity Bill Bid Pricing & Pricing Model 工程量清单投标报价及报价模型研究
- counting on engineering quantity bill 工程量清单计价
- fabrication cost by project quantity bill 工程量清单
- fabrication cost mode by project quantity bill 工程量清单计价
- quantity bill of construction works 工程量清单
- A 10% service charge is added on to the bill. 帐单上包括了百分之十的服务费。
- Quantity and price stated in the Invoice are subject to our final confirmation. 发票所列数量和价格以我公司最后确认为有效。
- It's Bill's wife who really rules the roost in that family. 在比尔家里,真正当家的是她的老婆。
- And the countermeasures that should be adopted: 1. Study and grasp "The rule of the construction project quantity bill calculating price"; 而应采取的对策有 :1.;研究掌握《建设工程工程量清单计价规范》 ;
- It is time to pony up on that bill. 是照帐付钱的时候了。
- He needed ten yuan to settle up this bill. 他需要十块钱来付清这一帐单。
- He put the telephone bill down as a business cost. 他把电话费用作为办公费记下。