您要查找的是不是:
- construction project delivery system 工程采购模式
- Fuel delivery system can be divided into two categories. 燃料供给系统可分为两大类。
- The uiOne delivery system is used to update UIs over-the-air. uiOne发布系统用来以无线方式更新UI。
- Manage the Project Delivery approval process with the ESC business unit. 负责整理国家项目管理指导要求的ESC项目交付成本和计划.
- Step 3: Does the service delivery system support IC? 第三步:服务提供体系是否有利于促进知情选择?
- This supply chain represents a value delivery system. 供应链描绘了一个价值传递系统。
- High pressure / high flow 6 nozzle coolant delivery system. 高压/高流量6嘴冷却系统。
- Quercetin self - microemulsifying drug delivery system. 槲皮素自微乳
- At least 2 years UHP Gas Delivery System experience 3. 2.;至少两年以上超纯气体输送行业经验;
- project delivery system 工程项目交易模式
- Coordinate with lower and middle level client staff and internal team to ensure opportune and quality project delivery. 与客户方内部项目组和员工合作保证项目实施进度和实施质量.
- Responsible for the co-ordination, costing and planning of ESC project delivery requirements with the country Project Management Lead. 负责整理国家项目管理指导要求的ESC项目交付成本和计划.
- To maintain the company's corporate image, ensuring high visibility in the market place through effective project delivery activities. 建立并维护公司形象,通过招聘项目执行确保市场对公司的认知度。
- Conclusions As a new drug delivery system,liposome entrapped cyclodextri. 目的介绍环糊精包合物脂质体给药系统的研究进展。
- Intermediate work products can be reduced and project delivery enhanced, to the extent that team communications are improved and frequency of delivery increased. 在一定程度上,如果开发队伍的交流得到了改善,发布的频率得到提高,那么就可以减少中间产品的工作量,从而能更快地完成项目。
- The IP layer provides a connectionless and unreliable delivery system. 在网络层提供了无连接的不可靠传输系统。
- What institutional arrangements are needed for participation and project delivery? Are there adequate plans for building the capacity required for each? 为了参与和项目交付需要什么样的制度安排?有没有充足的方案来进行能力建设?
- Solid lipid nanoparticle is a new drug delivery system of nano-range. 固体脂质纳米粒是一种新型的纳米给药系统。
- Allocate mechanical project tasks correctly according to team members' capability and capacity to ensure mechanical design quality and design cost ,project delivery on time . 根据小组成员的能力和工作负荷正确地分配机械项目任务,以保证机械设计按时,按质,按要求及时交付;
- The project delivery includes four 7.5 megawatt (MW) turbo compressors, air cooled heat exchangers, inlet scrubbers, slug catcher, and utilities systems. 项目传递包括四个7.;5MW的涡轮压缩机,空气冷热交换机,进气口洗涤器,段塞捕集器和公用系统。