您要查找的是不是:
- This can be done with project based education, where academics is a byproduct. 这是可以做到的基础教育项目,是一个学者副产品。
- The deliverable is determined during the project based on the environment.? 可交付内容由项目的环境所决定。?
- Project base includes intertropical base and base of South Asia tropics two. 工程基地包括热带基地和南亚热带基地两块。
- Web based curriculum is a teaching software made by the multimedia and web page at given teaching aim and hyperlink frame, which is a teaching design for the content of teaching material. It can be runned in the web browser of the internet. 它是一种按特定的教学目的和超链接的结构,对教材内容经过教学设计,以多媒体及网页形式制作的教学软件,可在互联网的网页浏览器中运行。
- Optimize unit efficiencies via operating target changes or longer term project based process changes. 经过变革运行目标,长期项目通过工艺变革,优化装置性能;
- The Class View window provides a view of your project based on classes instead of files, as in Solution Explorer. “类视图”窗口提供项目视图(基于类而不是文件),如同“解决方案资源管理器”中一样。
- WordNet is a very large project based on data whose basic underpinnings are very rigorously defined. WordNet是一个很大的基于数据的项目,数据的基础都有非常严格的定义。
- The field mapping file is specified on a per-team project basis. 字段映射文件是按每个团队项目来指定的。
- Remaining templates refer to projects based on version 2.0. 其余模板表示基于2.;0版的项目。
- The XML documentation file is built for this project based on Javadoc comments in the file. 随即基于文件中的Javadoc注释生成此项目的XML文档文件。
- Open Business Intelligence Development Studio, and create a new project based on a Report Server project type. 打开Business Intelligence Development Studio,创建基于报表服务器项目类型的新项目。
- schcol- based curriculum development 校本课程开发
- The test shows the project based on IPSec VPN proposed in the article can enhance the security of WLAN. 测试结果表明,本文提出的IPSec VPN方案,可有效增强WLAN的安全性。
- school based curriculum development 校本课程开发
- school- based curriculum development 校本课程开发
- Project base education is empowering students to learn, where the instructor is a coach, a facilitator. 基础教育是提高项目学生学习,而教练是教练,一名调解人。
- school-- based curriculum development 校本开发
- You can still choose to create a new project based on a different template if you save the project to your computer or network. 如果您将项目保存到本地计算机或网络上,仍可以选择基于其他模板新建项目。
- Two project based mechanisms introduced under Kyoto Protocol are: Joint Implementation (JI) and Clean Development Mechanism (CDM). JI-联合履行,京都议定书下包含基于两类机制的项目:JI,CDM。
- Aiming at the processing of minuteness axis,the article brought forward the processing project based on the WEDG of line incision machine tool. 针对微细轴的加工提出基于线切割机床的线电极放电磨削(WEDG)的加工方案。