您要查找的是不是:
- project target cost 项目目标成本
- How to Control the Logistics Target Cost. 如何实施物流目标成本控制。
- Lead team to set up project target, including Quality, Cost, timing planning and resource requirement. 领导项目小组完成质量、成本、费用以及期限目标,并按阶段进行项目跟踪和项目管理;拟定、优化、调整计划并确定资源上的需求;
- Assist team to set up project target, including Quality, Cost, timing planning and resource requirement. 协助项目小组完成质量、成本、费用以及期限目标,并按阶段进行项目跟踪和项目管理;拟定、优化、调整计划并确定资源上的需求;
- The implement mode of the engineering project of important thing for owner, the choice of the mode is relation to the implement of engineering project target, project cost, quality, time limit, owner risk and so on. 摘要建设工程项目的实施方式对业主来说是一个至关重要的问题,其模式方式的选择直接关系到业主各项目标的实现,关系到建设项目的成本、质量、工期、业主的风险等一系列指标。
- Develop new CATV product base on technical requirement, schedule and target cost. 根据技术要求、时间进程和成本目标研发新产品。
- Modify the OnlineAddressBookWS. Disco file and the deployment project target computer name to point to the computer you are planning to deploy to. 修改OnlineAddressBookWS.;disco文件和部署项目标计算机名;以指向打算部署到的计算机。
- The other is the method of lognitudinal-prediction of point value priority for target cost and gain the objective cost through advanced function unit. 另一种是纵向的企业目标成本的分值优先法,通过确定先进功能单元的分值确定目标成本。
- cost management of project target 目标成本管理
- Design and develop solutions,according to project targets and requirements. 根据项目的目标和要求,设计和开发解决方案。
- Sharing information with the other departments involved as well as carrying out cooperation negotiations with suppliers in order to reach target cost, quality and deadline. 和其他部门合作与供应商协调确保产品达到成本和质量要求。
- The paper expounds the management and control method of highway item cost at different stages in order to achieve the target cost of item and maximal economic benefit. 针对公路工程项目成本费用控制,分阶段进行了管理与控制方法阐述,以求实现项目的目标成本,取得最大的经济效益。
- The paper introduces the practice and experience of improving the economic efficiency by implementing target cost management in Guofa Forestry Co., Ltd. of Guangxi. 介绍了广西国发林业造纸有限责任公司通过推行目标成本管理,提高企业经济效益的实践经验。
- The text expounds the project characteristics, setup of project divisions ,construction programme and planning, control of project target and management of construction and production key elements. 阐述直接还原铁工程特点、项目部的建立、施工规划部署、项目目标的控制实施以及施工生产要素的管理。
- If references to.NET Framework 3.0 Assemblies exist, the Web project targets at least the.NET Framework 3.0. 如果存在对.;NET Framework 3
- Activity-based cost management (ABCM) and target costing (TC) are two exotic flowers of modern cost management. 作业成本管理与成本企画是现代成本管理的两朵奇葩。
- Define and evaluate the profile of future development in respect of target costing and with evaluation tools. 在目标成本方面利用相关工具对产品的发展趋势进行评估和剖析。
- The thesis has analysed Activity Based Cost Management (ABCM) and Target Costing (TC) and made them compare with the traditional cost management. 论文引用了作业成本管理法(ABCM)和企划成本管理法(TC),并与国内传统成本管理方法进行比较。
- The project was estimated to have cost $900,000. 这一工程估计耗去资金九十万美元。
- Contribution to the fourth stage, with activity analysis and costs, to verify target costs. 本阶段是第四阶段的继续。根据成本和活动分析核实目标成本。