您要查找的是不是:
- Scope Verification. Formalizing acceptance of the project scope. 範畴验证----是确保所有明定的专案交付标的已满意地完成。
- Six Sigma role similar in function to Black Belt, but length of training and project scope are reduced. 是一个功能上类似于黑带的六西格玛法角色,但培训及计划范围的长度较短。
- The preliminary project scope statement is developed from information provided by the initiator or sponsor. 项目初步范围说明书利用项目发起人或赞助人提供的信息编制。
- Project scope included replacement of 480V and 4.16KV switchgear at 17 existing substations in an NGL plant. 在已经存在的17个NGL工厂分站工程中包含480V和4.;16KV开关设备的置换。
- A project scope management plan is contained in,or is a subsidiary of,the project management plan. 项目范围管理计划包含在项目管理计划之内,也可作为其中一项分计划。
- Approved change requests can cause a change to project scope,project quality,estimated costs,or project schedule. 批准的变更请求可能会改变项目范围、项目质量、费用估算或项目进度。
- Verify and manage changes to the project scope, project schedule and project costs as defined in the change management plan. 核实和管理对在变更管理计划中定义的项目范围、进度和成本的变更。
- To reduce costs, you can cut project scope so that there are fewer tasks or shorter durations for tasks that need resources. 若要降低成本,可以削减项目的范围,这样就会减少需要资源的项目数或缩短任务中需要资源的期限。
- This is the process necessary for developing a detailed project scope statement as the basis for future project decisions. 这是制定详细的项目范围管理计划,为将来的项目决策奠定基础所必需的过程。
- Templates could include work breakdown structure templates,scope management plan templates,and project scope change control forms. 样板可能包括工作分解结构样板、范围管理计划样板与项目范围变更控制表格。
- The project management team in the Scope Definition process further refines the preliminary project scope statement into the project scope statement. 范围定义过程中的项目管理团队将项目初步范围说明书进一步细化为项目范围说明书。
- Willing to take short term business trip interpreter. Basic daily charge: RMB 1800.00 (8 hrs). Detailed benefit is based on project scope & roles. 求职意向:愿意接短期的商旅随同翻译项目(英文);按日计费;基本待遇1800元/日(8小时)具体按项目内容商议.
- To understand customer requirement of durability test, define equipment project scope, objective and generate master plan. 了解客户对零件耐久力测试的要求,定义设备目标和总的执行计划;
- These changes can require adjustments to the project management plan,project scope statement,or other project deliverables. 这些变更可能要求调整项目管理计划、项目范围说明书,或其他项目可交付成果。
- As part of the project scope, ABB will provide design, engineering, software, hardware, system implementation and related services. 作为该项目范围的一部分,ABB将提供设计、工程、软件、硬件、系统的实施以及相关服务。
- Moreover, as a project grows, so do potential issues and risks (risk: An event or situation that may negatively affect project scope, schedule, budget, or quality.). 而且,由于项目会扩大,因此会有一些潜在问题和风险。
- Project Scope Management includes the processes required to ensure the project inludes all the work reqiured, and only the work reqired, to complete the project successfully. 大致意思就是项目范围管理包括完成项目工作;且只完成项目工作所需要的过程.
- Facilitate obtaining required schedule information by all disciplines. Works with all departments to ensure an understanding of the total project scope and schedule. 按规定收集获取推进工程所需信息,和所有相关部门协同合作,确保其对整个项目范围和安排的理解。
- The project scope includes electrification of overhead lines, provision of auxiliary substations and a Supervisory Control And Data Acquisition (SCADA) system. 该工程包括铁路高架线电气化,辅助变电站电力供应,管理控制和数据采集系统。