您要查找的是不是:
- The research on the project risk of this paper can be divided into three interrelated parts of risk distinguish, risk evaluation and risk control. 本文在论文主体部分的开始即对这一问题进行了详细的阐释与分析。对于项目风险的研究,风险辨识、风险评估与风险控制是三个紧密联系的必要环节。
- A Study on IT Project Risk Evaluation Based on Rough Set 基于粗糙集的IT项目风险评价方法研究
- The improved grey relation grade and its application in project risk evaluation 改进灰色关联度及其在项目风险评价中的应用
- Cathay Project Risk Management Co., Ltd. 华澳工程风险技术咨询有限公司。
- What are the weakest points (risk evaluation)? 哪个是最弱点(风险评估)?
- project risk evaluation 项目风险评价
- Adopt iterative development practices that reduce project risk. 采取些减少项目风险的反复开发实践。
- Fuzz Comprehensive Assessment in Contracting Construction Projects Risk Evaluation 模糊综合评价法在建设工程承包风险评估中的应用
- Engineering project risk is very popular in reallife. 现实生活中,建设工程项目面临着很多风险。
- Overall process of risk analysis and risk evaluation. 风险分析和风险评价的整个过程。
- A risk evaluation model in software project investment based on Bayesian Networks(BNs) is presented in this paper. 摘要 提出了一种基于贝叶斯网络的软件项目投资风险评价模型。
- Study on the Method of Projection Risk Evaluation Based on Support Vector Machine 基于支持向量机的工程项目投资风险评价研究
- Assessing and mitigating project risks. 评估并减轻项目风险;
- On the basis of a detailed analysis on the risk of inherent characteristic of ULC project, an AHP model for the evaluation of ULC project risk hasbeen developed in this paper. 在对城市土地整理风险分析的基础上,构建了城市土地整理项目风险评估AHP模型。
- This gives the team a chance to learn on the job and minizes project risk. 这可以让项目组成员有机会学习这项工作并减少项目风险。
- Thus , risk evaluation of cataract induced by UVR is an urgent need. 因此,亟待开展紫外线与白内障的危险性评价。
- Slope hazards risk evaluation on Spontaneous ignition of goaf was conducted. 摘要针对采空区自然发火进行了危险性评价。
- As one of the critical steps, identification of risk factors affects the sequent risk evaluation directly. 摘要风险因素辨识作为风险评价的关键环节之一,其结果直接影响后续的风险评价。
- Warehousing projects investment risk evaluation is the prerequisite and decision-making basis of entire project. 仓储项目投资的风险评价,是整个项目决策的重要前提和依据。
- It is important to analysis project information to feedback, to prevent project risk in control phase. 控制阶段是对项目信息的深入分析与挖掘,及时反馈,以预防项目风险。