您要查找的是不是:
- project quality evaluation 项目质量评价
- the project quality evaluation, the green building evaluation, the multi-purpose concretes chemical additives, the high performance commodity concretes, energy-saving wall material and so on.. 工程检测与鉴定技术服务、商品混凝土、加气混凝土、混凝土外加剂、节能监管体系建设、建筑节能技术服务以及绿色建筑咨询服务等。
- What is Project Quality Management? 什么是项目质量管理?
- The project quality is masted by adoping histojram. 采用频数直方图法对项目质量进行了控制。
- Quality evaluation and quality improvement. 质量评估及质量改善。
- Management of engineering project quality and control of system II. 工程质量管理与系统控制2。
- Audit the project quality system in compliance with ISO. 根据ISO,审核项目及产品生产质量系统。
- Method for Video Quality Evaluation Based on HVS Properties[J]. 引用该论文 袁飞;黄联芬;姚彦.
- Strengthening supervision of project quality, plan implementation and fund use. 七是加强了对工程质量、计划执行及资金使用的监督检查工作。
- Goal‘s Completion And Preside Over Company‘s Quality Evaluation And Testing. 根据质量目标的达成情况评价质量体系的有效性,负责公司质量评价和检测等活动。
- After summarizing the practical experience of supervising project quality in China,five basic problems are raised that need to be solved in the present supervision and evaluation of project quality. 在对我国工程质量监督实践总结的基础上,提出了现行工程质量监督与评价中需解决的五个基本问题。
- Quality evaluation is one of critical techniques in concurrent design process. 设计质量评估是企业实施并行设计的关键技术之一。
- Application of gray correlation assessment method in casing quality evaluation. 灰色关联评估法在套管质量评定中的应用。
- Being one of the most consumable building materials, the concrete affects greatly on the project quality. 作为用量最大的土建材料,混凝土质量对土建工程质量有很大影响。
- Plan and promote quality evaluation activities for internal machining. 内部机加工的质量改善的计划及推进。
- Plan and promote quality evaluation activities for the casting parts. 计划和推进铸造件接收的质量评估活动。
- Plan and promote quality evaluation activities for the receiving parts. 计划和推进零部件接收的质量评估活动。
- Strong communication and collaboration skills, able to plan and assure project quality and delivery on time. 沟通协作能力,能对任务分解,和各种人有效共事,保证项目质量和进度。
- Support the Project Quality Control Manager to drive analysis of NCC's by ensuring integration into PIM. 支持项目质量控制经理驱动质量成本的分析,并整合到项目改进管理当中。
- The project manager and QA manager internally evaluate the project quality and team members'performance. 项目经理和QA经理对项目质量和项目成员的业绩进行内部评估。