您要查找的是不是:
- GPS is widely used in the project control survey at present. GPS当前被广泛地应用于工程控制测量中。
- You will report to CFO and Project Controller, TJS. 你的工作向财务总监和项目总监汇报。
- A formal, approved document used to guide both project execution and project control. 经批准的正式文档,用于指导项目执行和项目控制。
- The government to the tradition invests that the project control means reforms imperatively. 对传统的政府投资项目管理方式改革势在必行。
- Provide recommendations for planning and scheduling requirements relative to staffing and project control. 根据工程计划和进度要求,就人员配置和项目控制提出意见和建议。
- Maintain project schedule management procedure and extend use of project control software like P3. 维护公司的项目进度管理程序,推广使用P3等项目控制软件;
- Having enough work experience at field quality improvement project control, that's better work experience at Automobile compamy quality department. 具备市场整车质量改善项目管理工作经验,有整车厂质量部工经历更好。
- As your single point-of-contact solutions provider, we can help assure quality and consistency, as well as more effective project control. 作为您单独的方案供应商,我们能保证项目质量和一致性,并进行高效的项目控制。
- A success construction and more eary using of large-sixed projet construction is up to a level of project controlling and project manaing of project proprietor. 大中型建设工程项目的成功建设和尽早投入使用的关键在于项目业主的项目管理水平和控制项目的能力。
- Deliverable-oriented project modeling may yield some overly large activities, at least by the arbitrary standards of common project control systems. 面向可交付的项目模型可能产出一些极大的活动,至少是一般项目控制系统的任意的标准。
- It generalizes the project control in the computer information system in construction with the viewpoint basing on facts, improves quality, economizes the project time and funds. 以实事求是的观点在计算机信息系统集成项目建设中推广项目管理,提高项目建设的质量,节省项目建设时间与项目建设资金。
- Project Control also requires a clear trace as to when and how changes are made to baselines as well as a clear understanding and documentation of project configurations. 专案控制亦需要一个明确的轨道,用来说明何时及如何进行针对基准的变更和对专案型态的明确认知与文件化。
- The project post-sale implement includes project controlling and management, prophase investigation and study, business process defining, trainning systematically, and project check and acceptance. 项目的售后实施,负责项目控制、前期的调研、业务流程定义、系统培训、项目验收等。
- Work breakdown structure is the basis of project controlling and the model of duration-cost is put forward with the analysis of time and cost. AHP and FCE is used to weigh the risk of project cost, which is the basis of risk controlling. 工作分解结构是项目控制的基础,通过时间成本的权衡分析,提出了工期-成本的数学模型:针对工程项目的成本风险,用层次分析法和模糊综合评价法衡量项目成本风险,为风险控制提供较好的依据。
- The client says that your company has good project processes, and project controls unnecessarily inflate your costs. 客户说你的公司有良好的项目程序,项目控制不见得会增加你的费用。
- The Project Control section of the course describes techniques to help realign projects that have gone awry. 本课程的专案控制段落将说明叙述各种修正已偏离计划专案的方法与技术。
- If everyone does his part, the project will surely be a success. 如果大家都尽责,这个项目肯定会成功。
- He ventured on an ambitious project. 他冒险从事一项富有雄心的计画。
- The research project was only a partial success. 那个研究课题只取得部分成功。