您要查找的是不是:
- Project Cost Control and Construction Bid During Primary Design Stage 初步设计施工招标与造价控制
- Scheme Comparison and Cost Analysis of Yu-Zhan Expressway in Primary Design Stage 渝湛高速公路初步设计阶段的方案比较与造价分析
- primary design stage 初步设计阶段
- The product is at the design stage. 产品处于设计阶段。
- These are issues that will be addressed in the detailed design stage. 这些都是在详细设计阶段会予以处理的事项。
- Both BWA and mobile BWA application should be considered at the design stage. 移动宽带无线接入;
- What we then must do is prioritize our personas to determine which should be the primary design target. 接下来,我们必须要对人物角色进行优先级排序,以确定首要的设计对象。
- The first chapter is the primary design for cite C of the national seismic emergent succor training center. 第一章为国家地震紧急救援训练基地废墟训练场C场地(单层厂房)的倒塌方案设计。
- Since client is still under product design stage, final specification could summit at the mean time. 客户正在设计产品阶段,最终的资料将会一块提供。
- Usually, structure design is a course finished step by step, which divided into such 3 phases as primary design, details design and validate design. 结构设计通常是一个逐步完成的过程,它分为初步设计、细节设计和验证设计三个阶段。
- Design stage and construction stage deeply influence the cost of real estate project. 勘察设计和工程施工对房地产开发项目的成本费用影响较大。
- Based on the references and analysis, The primary design of the Converter which is a thin layer of polyethylene for fast neutron dosimeter is founded. 本文简单介绍了直读式个人中子剂量计的发展动态,在参考比较的基础上,提出了快中子剂量计转换屏设计方案。
- Design stage is the key point of controlling the construction cost, and more attention should be paid. 设计阶段是对工程造价影响最大的阶段,是控制建设项目工程造价的重点,应引起足够的重视。
- A primary design of electrically actuated brake system was presented, and give it's control theory, simulation and analysis. 摘要提出了全电刹车系统的初步设计方案,制定出刹车控制规律并对整个电刹车系统进行数字仿真分析。
- Conclusion The method is adaptable in engineering system design stage to reliability allocation. 结论该方法适用于工程系统设计阶段的可靠性指标分配。
- Implement measures to evaluate and reduce exposure risk at the process design stage. 在过程设计阶段采取措施来评估和减少曝露的危险.
- A programme from the design stage to finalize brewing shaped, and at least two weeks. 一套设计方案从酝酿阶段到最后确定成型,至少需要两周的时间。
- The primary design goals for NCL were to allow convenient access to data in a variety formats, allow for processing of the data, and allow for the creation of output graphics. 考虑到数据处理和图形的输出,当初设计NCL的主要目的是用它来方便的存取不通格式的数据。
- Zhongguancun West underground construction is nearing completion, the current entering monomer design stage. 中关村西区地下施工已接近尾声,目前进入单体设计阶段。
- The instruction of Sequence Control Relay (SCR) is used as the primary design method to achieve feeding, locating testing and fixing gas lock valve intermitently and in sequence. 以顺序控制继电器指令(SCR指令)作为实现控制的主要设计方法,实现了闭气塞的输送、定位、检测、抓取等环节按一定时序有节拍的控制。
- 今日热词
-
- 深远海浮式风电平台 - deep-sea floating wind power platform
-
- 京雄高速公路 - Beijing-Xiongan expressway
-
- 农业及相关产业增加值 - the added value of agriculture and related industries