您要查找的是不是:
- pressure testing flange 测压气门底盘
- Pressure testing of VPN (Virtual Private Network). VPN的压力测试,请问这样翻译对吗?
- Cylinder Compression Pressure Test. 汽缸压缩压力测试。
- Hold each pressure test for 10 minutes. 每次试验稳压10分钟。
- The depository for pressure test apparatus. 压力试验用具放置处
- Full pressure test the ram preventers. 对闸板防喷器进行全压试压。
- Associated pipework pressure test certificate. 附属喉管压力试验证明书。
- Bibbles-tight sesling with no leakage under the pressure test. 达到完全封闭,气体实验泄漏为零。
- Reassemble top-works, install valve, and pressure test. 重新组装顶部工作部件,安装阀门,进行压力测试。
- Hereby the fresh water should be used in the pressure test. 因此水压试验时只能用洁净的水进行。
- Record all pressure tests on a chart recorder. 用试压表记录试压记录。
- Safety valve to be pressure tested. 安全阀应做压力试验。
- What's to be done after water pressure test? Acid flushing or galvanizing? 水压试验后怎么处理,是酸洗还是镀锌?
- Any pneumatic or steam pressure testing allowed should be carried out when the minimum number of personnel are around. 任何经允许的气动或蒸汽压力测试均应限制在场人员数量至最少所需时进行。
- Gibson, C. F. "Pressure Testing &Changing the IT Organization." CISR Research Briefing #3D (October 2002). 压力测试与改革资讯技术组织>,信息系统研究中心,研究简报%233D,2002年10月。
- Pressure testing of all Duplex piping should be done after fabrication but prior to skid installation. 所有双相钢管道应在装配结束后和撬装工作开始前进行水压试验。
- Pressure testing and leak testing must be carried out by appropriately qualified personnel. 压力测试和泄漏测试必须由完全合格的人员进行。
- Wellhead pressure testing of abnormally high pressure gas well will be abnormal when unstable testing is conducted. 异常高压气井在井口进行不稳定测试时,井口压力动态出现异常。
- Pneumatic and steam pressure testing must be carried out under the direct supervision of an Authorised Engineer. 气动和蒸汽压力测试必须在授权工程师的直接监督下进行。
- The pipe system had passed the acceptance air pressure test performed by the installing contractor. 管道系统已经通过了安装公司所做的空气压力测试。