您要查找的是不是:
- To design, fabricate and repair test fixture. 设计;制作和修理测试机架.
- To plan and control the assumption of test fixture materials. 计划和控制测试机架原材料。
- Cylinder Compression Pressure Test. 汽缸压缩压力测试。
- Hold each pressure test for 10 minutes. 每次试验稳压10分钟。
- The depository for pressure test apparatus. 压力试验用具放置处
- Full pressure test the ram preventers. 对闸板防喷器进行全压试压。
- Associated pipework pressure test certificate. 附属喉管压力试验证明书。
- The requirement for a good test fixture is maximum stiffness for the lightest possible weight. 一台好的试验固紧装置应该是重量轻而刚度大。
- Have rich experience on test fixture building, able to build pneumatic controlled fixture is prefer. 具有丰富的测试治具制作经验,懂气动控制治具制作优先。
- Bibbles-tight sesling with no leakage under the pressure test. 达到完全封闭,气体实验泄漏为零。
- To prevent transients, always turn the source off while switching contacts in and out of the test fixture. 为了避免发生瞬变现象,一定要先将电流源关闭,然后再把接点接入测试夹具或将其断开。
- Reassemble top-works, install valve, and pressure test. 重新组装顶部工作部件,安装阀门,进行压力测试。
- DUT is placed in test fixture such a diode, transistors, microstrip circuit and so on. 被测件放在测试夹具里,如二极管、晶体管、微带电路等。
- Hereby the fresh water should be used in the pressure test. 因此水压试验时只能用洁净的水进行。
- Figure 2-12 shows a high mega-ohm resistor (RDUT) supported on two insulators mounted in a metal test fixture. 图2-12示出了测试夹具上由两个绝缘子支撑的高阻器(RDUT)。
- Record all pressure tests on a chart recorder. 用试压表记录试压记录。
- Again, it may be more economical to cut the cables in half, then permanently connect the cut ends to the test fixture. 同样,若将电缆分为两部分,然后将被截断的一端永久性地连接到测试夹具,则更经济。
- Safety valve to be pressure tested. 安全阀应做压力试验。
- The first step to verify the system requires that resistors of known value be placed in the test fixture. 验证系统的第一步需要将一个已知阻值的电阻器置于测试夹具中。
- Pressure testing of VPN (Virtual Private Network). VPN的压力测试,请问这样翻译对吗?