您要查找的是不是:
- Current Generalized Predictive Control algorithm, commonly whose predictive model of predictive output is based on the mathematical mode, rarely considers of the influence of modeling error. 目前的广义预测控制算法,一般其预测输出的预测模型都是建立在数学模型基础上的,都没有考虑到建模误差的影响。
- predicted model error 预测模型误差
- predictive model error 预测误差
- The prediction model of coiled tubing fatigue life. 连续油管疲劳寿命预测模型的建立。
- Based on the characteristics of distribution of SISE and theory of trend extrapolation of time series, we selected cubic polynomial predict model. 摘要基于SISE的分布特性和时间序列趋势外推理论,选择了三次多项大时间序列趋势外推模型预测SISE,结果表明该模型可行。
- The water temperature control model of holothurian aquaculture and the model error are analyzed in this paper. 摘要 主要研究养殖池内水温控制模型的建立与误差分析。
- We thence analyze compendiously model error’s influence of damage position and damage degree. 最后扼要地分析模型误差对损伤识别位置和损伤程度的结果影响。
- Convert GPS elevation project research method can reduce the model error, improve conversion accuracy and conversion computational efficiency. 项目研究转换GPS高程的方法,能减少模型误差,提高转换精度和转换计算效率。
- Based on the relative error minimizes principle, the grey combination prediction model was discussed. 以这些模型为基础,按照相对误差极小化的原则,建立了灰色组合预测模型。
- H.S.Lu, B.Y.Lee and C.T.Chung, 2005, “The predicted model of surface roughness in resharpening end-mill for tool grinder”, International Conference on Advanced Manufacture, Taipei, Taiwan. 吕淮熏,张清靠,林文锋,苏俊仁,郑耀鸿,2006,“结合灰关联分析与主成份分析应用于高速端铣切削参数最佳化设计”,彰云嘉大学校院联盟2006年学术研讨会。
- Essentially, waveform inversion is to extract residual structural information between the real earth and predicted model from the waveform residuals between the observed and the synthetic seismograms. 波形反演实质上是将实测地震记录和预测地震记录的波形残差信息转化为实际地质模型和预测地质模型的模型残差信息。
- Also known as predictive models? 导向模式?
- With the prediction model, the RMSEC (root mean square error of calibration) for aromatics and olefins in gasolines were 0.2090 and 0.2142, respectively. 预测模型对汽油中芳烃和烯烃含量的RMSEC分别为0.;2090和0
- EOF analyst method is developed to prediction model and here it is used to restore and predict the underwater terrain. 对累积的大量数据进行专题分析,目前发展了EOF分析方法为预测模式,并对黄河三角洲水下地形的恢复和预测作了探讨。
- The predict model for CBD stones consists of 5 variables that are ultrasonographically showing CBD stones or bile duct dilation(BDD),aged above 65 years,fever,serum alkaline phosphatase level greater than 121 IU/L and serum amylase level above 100 U/L. 根据5项指标:B超发现胆总管扩张或胆总管结石、年龄大于65岁、发热、血清碱性磷酸酶>121 IU/L、血清淀粉酶>100 U/L,可预测胆总管结石存在的可能性。
- Then, due to the existences of G-FNN modeling error and external disturbance, a robust compensator was designed based on control theory. 考虑到网络建模误差和外部干扰的存在,还设计了基于控制理论的鲁棒补偿器。
- In this paper, by studying the investment question deeply the predict models are pretended from three angles . 本论文在深入研究投资问题的基础上,提出从三个角度建立不同的投资预测模型,它们分别是:根据投入和产出的关系,建立投资的产出预测模型;
- A nonlinear identification algorithm base on the minimum model error(MME) approach and multiple shooting method is used to identify nonlinear dynamic model during aircraft take off and landing affected by ground effects. 利用基于最小模型误差法和线性不连续跳跃多重打靶法建立的非线性辨识法,辨识了飞机起飞着陆过程的非线性动态模型。
- The results showed the chip breaking predictive model was reasonable. 结果显示切屑折断范围与模型预报切屑折断范围基本一致;证明了切屑折断预报模型的合理性.
- Experiment results show that support vector classification algorithm has higher accuracy as though the output of ID3 is more comprehensive, and the predict model constructed by support vector regression is reliable. 实验结果表明,尽管ID3算法的结果可理解性较好,但支持向量分类算法有更高的精度; 支持向量回归算法建立的预测模型是可靠的。