您要查找的是不是:
- inherent stress box beam 预应力箱梁
- The main suspension gallows consist of a steel box beam, sitting on hydraulic jacks that support all the structure during concreting. 主吊架有一钢箱梁组成,坐落在液压千斤顶上,在浇注混凝土过程中支撑所有结构。
- continuous pre stressed reinforced concrete beam 预应力混凝土连续梁
- The pre stressed anchoring piles aere used to controll large-scale landslides and creat flats to build. 本文论述了预应力锚拉桩在库区大型滑坡防治中的应用成果 ,这种方法不仅能有效地控制滑坡体的稳定性 ,同时 ,也能根据移民工程要求提供适宜的建设用地 ;
- Shear walls and the walls of the hollow box beam will be approximately 50 cm thick. 剪力墙和空心箱形梁的墙厚约50厘米。
- Compared with the railway bridge and culvert design specifications, the box beam structure design and construction method are seen rational and feasible. 通过有限元分析结果与铁路桥涵设计规范的比较得出,该箱梁结构设计合理,施工方案可行。
- The acceptance test results showed that the construction of pre stressed anchorage cable of permanent ship lock meets the requirements of design. 验收试验成果表明,永久船闸预应力锚索的施工符合设计要求。
- The concrete spiral case of the GHS is reinforced with the pre stressed anchorage cable, which is the first case in China. 高坝洲水电站混凝土蜗壳采用预应力锚索加固,这在国内尚属首例,其预应力锚索包括水平环向锚索和垂直竖向锚索。
- Restrained torsion of thin-walled box beam with honeycomb core is analyzed on the basis of rigid profile assumption. 在刚性剖面假设的基础上分析具有蜂窝芯材薄壁盒式梁约束扭转问题。
- Due to the high water head of the GHS, the design unit put forward a suggestion of using the pre stressed reinforced concrete spiral case. 高坝洲水电站由于设计水头较高,设计单位建议采用预应力钢筋混凝土蜗壳。
- Restrained bending of thin-walled box beam with honeycomb core is analyzed on the basis of rigid profile assumption. 在刚性剖面假设的基础上分析具有蜂窝芯材薄壁盒式梁约束弯曲问题。
- drilling with compressive pre stress 预压应力钻削
- The paper mainly expounds construction procedures for concrete box beam prestressed in post-tensioning method. 本文主要阐述了后张法预应力混凝土箱梁的施工方法。
- The paper discussed the procedure and attentions of box beam precast for reference. 介绍了广州市环城高速公路跨广州大道连续箱梁桥的工程概况。
- In three desilting tunnels of Xiaolangdi Multipurpose Project, over 70% tunnel wall were lined with non cohesive pre stressed concrete by the post tensioning method. 小浪底水利枢纽工程的3条排沙洞,洞身70%25以上采用后张法无粘结预应力混凝土衬砌。
- The paper discussed proportion between side span and middle span in three spans prestressed continuous box beam bridge. 本文对三跨预应力连续箱梁桥的边跨与中跨比例问题进行了初步的探讨。
- The article introduces the technical gist of the construction control of the fish-bellied concrete continuous box beam. 该文介绍了鱼腹式混凝土连续箱梁的施工控制技术要点。
- The paper gives the recount for the method and function of calculating distortion geometric nature of arbitrarily section in continuous box beam. 叙述任意截面箱形连续梁畸变几何性质的计算方法和作用。
- Abstract: In order to satisfy the requirements of both ultimate limit state and servicing limit state unbonded partially pre stressed concrete flexural members must be reasonably designed. 摘 要: 为满足承载能力极限状态及正常使用极限状态的要求,必须对无粘结部分预应力混凝土受弯构件进行合理设计。
- Stress can be the undoing of so many fine players. 紧张可能是这许多优秀选手失败的原因。