您要查找的是不是:
- The pre stressed anchoring piles aere used to controll large-scale landslides and creat flats to build. 本文论述了预应力锚拉桩在库区大型滑坡防治中的应用成果 ,这种方法不仅能有效地控制滑坡体的稳定性 ,同时 ,也能根据移民工程要求提供适宜的建设用地 ;
- pre stress anchor 预应力锚杆
- Pre - stressed anchor cable 预应力锚索
- Basic Experiments for High Slope Pre- stressed Anchor Cable (Bar) Test Hole 高边坡预应力锚索(杆)试验孔基本试验
- distributed stress anchor cable 压力分散型锚索
- To uncoil(an anchor cable)on deck so the anchor may descend easily. 解开锚缆在甲板上解开(缆绳)以便能更快下锚
- The acceptance test results showed that the construction of pre stressed anchorage cable of permanent ship lock meets the requirements of design. 验收试验成果表明,永久船闸预应力锚索的施工符合设计要求。
- The concrete spiral case of the GHS is reinforced with the pre stressed anchorage cable, which is the first case in China. 高坝洲水电站混凝土蜗壳采用预应力锚索加固,这在国内尚属首例,其预应力锚索包括水平环向锚索和垂直竖向锚索。
- Nautical To uncoil (an anchor cable) on deck so the anchor may descend easily. 解开锚缆:在甲板上解开(缆绳)以便能更快下锚
- To uncoil(an anchor cable) on deck so the anchor may descend easily. 解开锚缆在甲板上解开(缆绳)以便能更快下锚
- This paper introduces the application about anchor cable jetting combined supporting in broken soft rock drift. 重点介绍了锚索喷注联合支护在碎胀软岩巷道掘进中的应用。
- The gob-side entry driving in the fully-mechanized coal winning face can be protected successfully by using the anchored cable and rod supporting system. 采用锚杆、锚索支护系统成功地维护了综放沿空掘巷,保证了综放面顺利回采。
- Yet it is so fathomless that no anchor cable,however long, can reach its bottom. 然而它是很深很深,深得任何锚链都达不到底。
- drilling with compressive pre stress 预压应力钻削
- HU Yi-fu.The research of ultimate span of anchored cable's reinforcing silllike adjacent rock[J].Journal of Central-South Institute of Mining and Metallurgy.1994. 25(4): 97-101. [4]胡毅夫.;锚索锚固层状围岩极限跨度的探讨[J]
- Due to the high water head of the GHS, the design unit put forward a suggestion of using the pre stressed reinforced concrete spiral case. 高坝洲水电站由于设计水头较高,设计单位建议采用预应力钢筋混凝土蜗壳。
- Next, I took out my knife and cut the anchor cables. 接着,我拿出了刀子切断锚的缆绳。
- In three desilting tunnels of Xiaolangdi Multipurpose Project, over 70% tunnel wall were lined with non cohesive pre stressed concrete by the post tensioning method. 小浪底水利枢纽工程的3条排沙洞,洞身70%25以上采用后张法无粘结预应力混凝土衬砌。
- When constructing on super section lane, combining roof bolt, anchor cable, anchor cable series, is scientific and reasonable, can achieve good effect. 超大断面巷道施工,采用锚杆、锚索、锚索组联合支护,科学合理,实现了安全高效的良好效果。
- The ultimate pull-out force of soil anchor is also provided in saturated mealy sand.If the length of anchor cable is unequal, the force is unequal. 试验得到饱和粉质砂土锚杆极限抗拔力值,尽管锚固体长度相等,但不同长度锚索极限抗拔力值差异较大。