您要查找的是不是:
- power grid parameter identification 电网参数辨识
- power grid parameter 电网参数
- China Southern Power Grid Corporation Ltd. 中国南方电网有限责任公司。
- In charge of the topics on wind power grid integration study. 负责风电接入电网分析方面的课题。
- Hit by the heavy storm, the power grid can not function properly. 受到暴风雪的影响,电力网不能正常运作了。
- Demand-side management (DSM) can improve power grid load property. 电力需求侧管理有改善电网负荷特性的作用。
- Computers are employed to monitor and control the power grid. 使用电子计算机对电网运行状况进行监控。
- C.Many switched to electric heaters, overloading the power grid. 许多家庭开始使用电加热器,造成电网超负荷运作。
- Mainly of three - phase structure, good for power grid balance and mass usage. 以三相结构为主,有利于电网平衡和批量使用。
- Another threat to electricity supply comes from the power grid itself. 电力供应的另外一个威胁则来自于电网本身。
- The instable voltage of power grid shortens the service life of street lamps. 电网供电电压不稳定,致使路灯的使用寿命缩短。
- The suggestion for the innovation on Xiangfan power grid was put forward. 提出了对相关电网的改造建议。
- By means of the proposed algorithm the sensitivity of nodal voltage to any network parameter can be obtained, such as line reactance, variation of reactive power of power grid and so on. 通过该算法可得到节点电压对任何网络参数的灵敏度,比如线路电抗、电网无功功率的变化等。
- GUAN Xiupeng,CHENG Lin,SUN Yuanzhang,et al.PSS parameter optimization on large-scale interconnection power grid based on Prony method.Automation of Electric Power Systems,2006,30(12):7-11. [6]管秀鹏;程林;孙元章;等.;基于Prony方法的大型互联电网PSS参数优化设计
- A selection of grid parameters is usually ignored When structural maps are made by using a workstation software. 摘要在利用工作站软件进行构造成图时,网格参数的合理选取常常被忽视。
- Once when the local power grid failed,Young recalls,the rain forest shot from 85 to 120 degrees F in just 15 minutes. 扬回忆到,本地的高压输电网曾经无法正常运转,结果热带雨林的温度在15分钟之内从华氏85度窜升到120度。
- Meanwhile, a southern power grid company based on local assets will be established. 同时还将成立以地方资产为主的一个南方电网公司。
- An outline of Sunlight Procurement System of Guangdong Guang-Dian Power Grid Group Co., Ltd. 广东省广电集团有限公司阳光采购系统概述。
- As a case study, patch reefs in NW Palawan basin are used to discuss the impacts of selected grid parameters on structural mapping by comparing effects of different parameters. 以西北巴拉望盆地发育的点礁为例,通过时比不同参数的成图效果,讨论了网格参数选取时构造成图的影响。
- All modules should be online when a ship fitted with a rig giving a bonus to power grid is activated. 装配有加成能量栅格改装件的舰船被激活时,所有装备必须在启用状态。