您要查找的是不是:
- plan of capital construction 基本建设计划
- The cost control of capital construction ought to lay stress on the dynamic control in the whole process. 摘要基本建设的造价控制应注重全过程的动态控制。
- capital construction plan of current year 本年基本建设计划
- The scale of capital construction must be suited to the overall capabilities of the nation. 基本建设的规模要和国力相适应。
- To reduce the deficit, the scale of capital construction, especially of non-productive projects, has to be kept under control. 为了解决财政赤字问题,基建规模特别是非生产性建设规模不能过大,有些开支不能完全由中央承担。
- To reduce the deficit,the scale of capital construction,especially of non-productive projects,has to be kept under control. 为了解决财政赤字问题,基建规模特别是非生产性建设规模不能过大。
- I have blocked in a plan of the house. 我已粗略地画出了房子的草图。
- The main impediment to growth is a lack of capital. 影响发展的主要障碍是缺乏资本。
- The commander chalked out his plan of attack. 司令官对进攻计划作了粗略的介绍。
- Acting on the procedure of capital construction means a lot to the qua lity and investment effect of a construction project. 是否按照基建程序办事,关系到工程质量的优劣和投资效果。
- To reduce the deficit. the scale of capital construction, especially of non-productive projects, has to be kept under control. 为了解决财政赤字问题,基建规模特别是非生产性建设规模不能过大,有些开支不能完全由中央承担。
- The general grew out his plan of action. 将军草拟了他的行动方案。
- For the above-mentioned reasons, discussion is held on the controlling approach to the project cost in the prophase of capital construction. 基于此,对工程造价在基本建设前期的控制途径进行了分析。
- They have traced the plan of the construction site. 他们已经画出工地平面图。
- He chalked out a simple plan of the new building. 他用粉笔勾画了新大楼的简图。
- Many issues have existed in auditing practice of capital construction project final accounts in universities. Corresponding measures must be taken to solve them. 高校基建工程决算审计实践存在不少问题,要针对存在问题的原因及危害采取相应的措施。
- They elaborated a plan of study. 他们仔细制订了学习计划。
- He traced out the plan of the construction site . 他描绘出这个工地的平面图?
- To record all the projects strictly in compliance with the approved plan of capital expenditure and expense expenditure, and estimate the cost and liability in accordance with the progress of the projects. 严格按计划批复的资本性支出和费用化支出项目进行核算,每季度末依据工程项目进度预估成本及负债。
- I have block in a plan of the house but have give no details. 我已画出房子的草图,但尚未标出细节。