您要查找的是不是:
- Pipe jacking construction may induce disturbance of soil around the pipe and result in ground movements. 顶管施工会对管道周围的土体产生扰动,引起土体移动。
- The value of a calculated case of pipe jacking in soft soils is compared to that of observations. 利用所建立的半解析单元法,就软土地层中顶管工程实例计算了施工所引起的土体位移。
- System as the airport taxiway lighting project navigation node, pipe jacking successfully achieve in a few days ago. 作为机场滑行道系统助航灯光工程的节点,顶管施工于日前顺利完成。
- As the development ofscience and technology, pipe jacking will also advance continuously for low cost andwide application. 随着科学技术的进步,顶管施工技术也将不断提高,施工费用也会越来越低,应用范围也必将会越来越广。
- In municipal construction, the pipe jacking technology has more and more riveted peoples attention because of its advantages. 摘要在市政建设中,顶管技术由于其优越性,越来越受到人们的重视。
- Abstract :Pipe jacking in soft soils may induce ground movements, including ground settlement and axial movement of soils below the ground surface. 顶管施工引起包括地面沉降和土的轴向移动在内的土的运动。
- Application of SMW engineering methods in pipe jacking engineering[J].Journal of Zhejiang University of Technology,2001,29(2): 103 - 106. SMW工法在顶管工程中的应用[J].;浙江工业大学学报;2001;29(2):103-106
- Application of SMW engineering methods to pipe jacking engineering[J].Journal of Zhejiang University of Technology,2001,29(2):103-106. SMW工法在顶管工程中的应用[J].;浙江工业大学学报;2001;29(2):103-106
- Slurry pipe jacking was firmly established as a special method for the non-disruptive construction of the underground pipelines of sewage systems. 顶管施工泥浆被坚定地确立为一种特殊的方法非破坏性建设的地下管线的污水处理系统。
- The established model, are applied in a pipe jacking engineering, and the result indicates that the conclusion accord with the fact. 运用建立的模型对一个具体的顶管施工问题进行了应用研究,结果表明,所得结论符合工程实际。
- The distribution regularity of total additional load on perpendicularly crossing buried pipeline induced by pipe jacking construction is studied. 研究了顶管施工在邻近垂直交叉地下管线上引起的附加荷载分布规律。
- Under the unsteady soil and great amount of groundwater seepage flow in the Gobi De-sert, the foundation consolidation method for driving and pipe jacking construction was introduced. 介绍了在戈壁土土质不稳定和地下水渗流量大的情况下,进行人工掘进顶管施工的基础加固方法。
- Under no circumstances shall the pipe jack continue once either the vertical or horizontal tolerance has been exceeded until the S.O. has accepted the Contractor's Recovery Plan. 如果水平或垂直误差超限,在S.;O
- This paper introduces the epicyclic reduction arrangement applied in cutting drive mechanism in pipe jacking,analyses the construction and characteristics of epicyclic reduction arrangement. 介绍顶管掘进机截割传动装置所采用的行星齿轮减速器,论述行星齿轮减速器的结构特点。
- Jack was assigned to the assembly shop of the factory. 杰克被分配到厂里的装配间工作。
- Large Caliber Pipe with Concrete by Pipe Jacking 大管径砼顶管施工
- I am longing to see my friend Jack again. 我渴望再见到我的朋友杰克。
- He has no intention to jack up the plan. 他没有放弃这个计划的意思。
- The fire cracker went off and scared Jack's dog. 爆竹爆炸声把杰克的狗吓了一跳。
- curved pipe jacking project shallow buried 浅埋曲线顶管