您要查找的是不是:
- Abstract: Negative friction places an important role in geotechnics and it has been paid attention increasingly in geotechnical engineering, especially in pile foundation project. 文章摘要: 负摩阻力在岩土工程领域中占有重要的地位,在工程实践中特别是桩基工程中,负摩阻力日益受到重视。
- The paper introduces the pile-making equipment and construction techniques of DX pile and its application of a pile foundation project in high-rise building in Wuhan. 本文介绍该桩的成桩设备和施工工艺以及在武汉某高层建筑桩基工程中的应用。
- Some notice of grade estimation of the pile foundation project 桩基工程质量评定的注意事项
- A Case History of a Pile Foundation Project for Optimal Design 某桩基工程优化设计实例
- Application of Air Compressor Removing Hole Bottom Settling Residue in Pile Foundation Project 空压机清理孔底沉渣在桩基础施工中的应用
- Door Frame Type Drilling Rig Applied to Construction of Above Water Pile Foundation Project 门架式钻机在水上桩基工程施工中的应用
- Discussed shallowly the bridge pile foundation project turns on lathe digs the drill hole construction technology 浅谈桥梁桩基工程旋挖钻孔施工技术
- DX pile is a new-style pile foundation. DX挤扩灌注桩是一种新型的桩基础。
- pile foundation project 桩基项目
- The long-shot pile foundation is a new type of foundation. 因此,为安全地推广和不断发展这种新型基础,有必要对其工作性状进行系统研究。
- This paper expounds the application of the cast-in-place pile for its function and grouting technique in the foundation project of bridge construction. 摘要通过对钻孔灌注桩地基处理的工作机理及桩端压浆技术在桥梁建设地基工程中的应用。
- Artificial pile foundation set into rock,skirt building with prestress plane floor and tower building with steel reinforced concrete(SRC)structure are adopted in the project. 工程基础采用人工挖孔嵌岩灌注桩,裙楼采用预应力平板楼盖,塔楼采用钢骨混凝土结构。
- Design and Construction of Pile Foundation in a Rich Water Fault Zone. 富水断裂带上桩基设计与施工。
- The foundation of this design is prefabricated ferroconcrete pile foundation. 本设计的基础采用预制钢筋混凝土桩基础。
- The cast-in-situ pile foundation of China central Place project (Phase II) with the foundation pit of 18.8m deep, using post-grouting technique (CABR-FE Co. Ltd. 河南艺术中心大剧院基坑及桩基工程,占地面积10公顷,建筑面积75000平方米,基础设计1321根工程桩.基坑轮廓面积8000平方米,由中技集团公司完成
- According to the foundation project of Chongyang bridge,the stability of hole wall of pile to different soil layers was analyzed on the analysis of condition of hole wall stability,at . 结合重阳大桥钻孔灌注桩工程,在分析孔壁稳定条件的基础上,进行不同土层的钻孔孔壁稳定性分析,同时分析孔内泥浆的稳定护壁作用及功能,建立孔壁稳定性数学分析模型,提出相应的护壁措施,防止孔壁的坍塌。
- The query value macro that is replaced by the name of the currently selected Team Foundation Project. 由当前选择的Team Foundation项目的名称替换的查询值宏。
- A Team Foundation project member is anyone who uses Team Foundation and is an active member of a team project. Team Foundation项目成员是指使用Team Foundation并且是团队项目的活动成员的任何人。
- This would be the prime concern for consideration of the pile foundation alternative. 这是选用桩柱地基所须考虑的首要问题。
- I have a huge pile of letters to deal with. 我有一大堆信件要处理。