您要查找的是不是:
- counterforted pile foundation work 扶壁式桩基
- A practical example of drainage culvert application to replace the pile foundation works for foundation treatment in a hydro-structure on mud ground base is presented. 主要介绍了在淤泥地基上建造水工建筑物时,利用排水涵管取代桩基础的工程实例。
- Pile foundation work taking foundation-dewatering construction in considerations 因施工基础降水所引发的对桩基工程的思考
- The application of concrete filled steel tubular structure in pile foundation work 钢管混凝土结构在桩基础工程中的应用
- pile foundation work 桩基
- DX pile is a new-style pile foundation. DX挤扩灌注桩是一种新型的桩基础。
- The Team Foundation work item tracking database. Team Foundation工作项跟踪数据库。
- Evaluation and Value Section of Single Pile's Vertical Load-Bearing Capacity for Soft Soil Pile Foundation Works 软土桩基工程中单桩竖向承载力的评判与取值
- The long-shot pile foundation is a new type of foundation. 因此,为安全地推广和不断发展这种新型基础,有必要对其工作性状进行系统研究。
- The Team Foundation work item tracking attachments database. Team Foundation工作项跟踪附件数据库。
- To be responsible for the HR & Adm. aspect foundation work. 负责人事行政方面基础工作。
- Design and Construction of Pile Foundation in a Rich Water Fault Zone. 富水断裂带上桩基设计与施工。
- The foundation of this design is prefabricated ferroconcrete pile foundation. 本设计的基础采用预制钢筋混凝土桩基础。
- Team Foundation work item tracking schema defines a specific work item type. Team Foundation工作项跟踪架构用于定义一种特定的工作项类型。
- Introduces concepts for working with Team Foundation work items. 介绍用于使用Team Foundation工作项的概念。
- pile foundation works 桩基工程
- This would be the prime concern for consideration of the pile foundation alternative. 这是选用桩柱地基所须考虑的首要问题。
- The following table lists the query variables available in Team Foundation work item tracking. 下表列出了Team Foundation工作项跟踪中的可用查询变量。
- Poulos, H. G. and Davis, E. H. (1980), “Pile Foundation Analysis and Design”, John Wiley and Sons, Inc., New York. 叶兴鸿(1996),“转换辐射阻尼于基桩轴向、侧向行为之模拟与应用”,硕士论文,淡江大学土木工程研究所,台湾,淡水。
- Team Foundation work item tracking includes some query variables to dynamically add values to your query. Team Foundation工作项跟踪包括一些可用来动态地向查询中添加值的查询变量。